SLAC PEP-II
BABAR
SLAC<->RAL
Babar logo
HEPIC E,S & H Databases PDG HEP preprints
Organization Detector Computing Physics Documentation
Personnel Glossary Sitemap Search Hypernews
Unwrap page!
Det. Search
Who's who?
Meetings
FAQ
Images
Archive
Systems
Performance
Intern. region
Vertex Tracker
Drift chamber
DIRC
Calorimeter
IFR
LST
Magnet
Electronics
Trigger
Operations
Run Coordination
Contact Experts
Shift Takers Info
Operations Manual
Electronic Logbook
Ops Hypernews
Shift Signup
Check this page for HTML 4.01 Transitional compliance with the
W3C Validator
(More checks...)

List of deliverables needed by Level 3

Note that the critical date lists the date by which non-deliverance will impact on the Level 3 milestone deadlines.

Subgroup Request Critical Date
Trigger L1 Segment Tracker geometry
updated to match current DCH
simulation
Feb. 1
complete transient digi's for
EMT and GLT
first release after
Feb. 12
persistent digi's readable and
writeable for GLT, EMT,
TSF, and FCT
first release after
Feb. 12
tagged container (TC) info.
for all the above
Feb. 13
conversion for TC < --> digi
for all the above
Feb. 20
SVT persistent-capable classes first release after
Feb. 12
help on evaluating synchrotron
rad. backgrounds in SVT
Feb. 1
DCH transient digis Jan. 30
persistent-capable classes first release after Feb. 12
EMC transient digis Jan. 30
persistent-capable classes
for digis
first release after
Feb. 12
Feb. 20
OEP support for AppModule
subclasses
Jan. 31
pre-scaler (earliest form
of an OEP "consumer" for L3
Jan. 31
distributed histogramming Feb. 1
use of the configuration
database for script parameters
Feb. 13
correct means for
error-handling
after PDR
Production/
Simulation
tied to MDC2. No special
runs other than the one
already requested trigger
production re-run. Need
to aim for continued
coordination, especially
for the next production run
with non-uniform B field and
new TURTLE rays
Generator incorporation of
multi-lepton final
state generator into
BaBar code
Feb. 13
Commissioning new set of TURTLE rays for
later production run
mid-April
Physics required accuracy on event
parameters for Bhabhas used
in luminosity measurement
Feb. 20