SLAC PEP-II
BABAR
SLAC<->RAL
Babar logo
HEPIC E,S & H Databases PDG HEP preprints
Organization Detector Computing Physics Documentation
Personnel Glossary Sitemap Search Hypernews
Unwrap page!
Det. Search
Who's who?
Meetings
FAQ
Images
Archive
Systems
Performance
Intern. region
Vertex Tracker
Drift chamber
DIRC
Calorimeter
IFR
LST
Magnet
Electronics
Trigger
Operations
Run Coordination
Contact Experts
Shift Takers Info
Operations Manual
Electronic Logbook
Ops Hypernews
Shift Signup
Check this page for HTML 4.01 Transitional compliance with the
W3C Validator
(More checks...)

Back to: [BABAR] [Level 3] [Trigger] [Trigger Reviews] [Electronics] [OEP] [Online] [Computing]

Level 3 Trigger Conceptual Design Review

and Preliminary Design Requirements Review

11 August 1997


This is the home page for the Level 3 CDR.

It serves as an index to all materials related to the CDR, and will become increasingly complete as the review date approaches. Following the review, it will remain frozen as a reference for the future.


Focus of the Review

The review will cover these main topical areas:

  1. Level 3-related elements of the Trigger Requirements
    (Level 3 inherits all of the essential and many of the functional requirements on the trigger as a whole, and additionally has some essential and many functional requirements of its own);
  2. The conceptual design (a/k/a the Essential Model and System Block Diagrams);
  3. Level 3 interfaces; and
  4. Prototype work and R&D on specific Level 3 algorithms.

A design method explanation (draft) is available that explains somewhat the needed material for the CDR.


Organizational matters

The Conceptual Design Review will take place on Monday 11 August 1997 at SLAC. The public sessions will take up approximately a half day, bracketed by committee sessions and a close-out. The review committee has been selected by Trigger electronics management.

The public sessions will be held in the Orange Room, with closing executive sessions (after 15:00) in Training Center A&B.


Materials - Documentation

Requirements

Conceptual Design

Interfaces

Algorithm R&D Reports

Management issues

  • Deliverables, staffing, schedule and milestones

Materials - Presentations

(Agenda as actually presented)

Morning Session: Requirements, Algorithm R&D

Afternoon Session: Conceptual Design, Project Planning

[Directory]


Miscellaneous

The Level 3 Trigger group

Old format subdirectories - [/BFROOT/www/Detector/Trigger/97/level3/cdr (directory)] [/BFROOT/www/Detector/Trigger/97/level3/diagrams (directory)] [/BFROOT/www/Detector/Trigger/97/level3/intspec (directory)]

Requirements update history - [CVS trigpdrr/]

Materials requested

List of review materials needed for PDRR+CDR and PDR (text) Andy Lankford, December 14, 1995


Gregory Dubois-Felsmann
Last modified: Wed Sep 24 21:54:20 PDT