Calorimeter L1 Trigger Preliminary Design Review, Nov 10 1997
The Level 1 Calorimeter and Global Trigger Preliminary Design Review date is November 10, 1997, at SLAC.
Review Committee
Agenda
Documentation:
- System Description
- Block Diagrams and Schematics
- External Interface Specifications Documents
- Internal Interface Specifications Documents
- Grounding and Shielding
- Deliverables, Cost and Schedule
- Preliminary Test Plan
- Requirements and Other Backup Documents
Materials requested
List of review materials needed for PDRR+CDR and PDR (text) Andy Lankford, December 14, 1995
Electrical engineering materials needed: (current understanding, April 1997)
-Stuff needed for PDR for each euro module (in order of priority):
1. schematics
2. VHDL of all FPGAs
3. floor plan of parts
4. short write-up of module and back of the crate board
including:
interface specs
power calculation
gnd and shielding plan
parts list
schedule
5. board level simulation
|