L1 Calorimeter and Global Trigger Preliminary Design Review
Back to Trigger home page - [Reviews]
The Level 1 Calorimeter and Global Trigger Preliminary Design Review date is November 10, 1997, at SLAC.
Review Committe
Agenda
Committee Report
EMT
Please see the Calorimeter Trigger PDR page (SLAC or RAL).
GLT
Please see the Global Trigger PDR page (SLAC, US). |