BaBar Trigger Group Documents _____________________________ Those documents resident at LBNL may be more up-to-date than those at SLAC. Files: README This file TRIGGER-9-28-95-system.ps Presentation at electronics meeting Sep 28, 95 agenda-* Meeting agenda for meeting on * (date) bfmail-instructions Instructions for TRIGGER bfmail copyscript Script to copy files to SLAC Trigger doc area emc-trigger-simulation-status-aug17.txt EMC trigger sim status Aug 17, 95 faxpackage-* Fax package for meeting on * (date) faxscript Fax script for Trigger group guide Guide to trigger simulation tools latency-report.txt Revised L1 Trigger Latency Spec, report, 9/5/95 members Members and their email meetings95.html List of meetings in 1995 minutes-* Minutes for meeting on * (date), some are .html phoneandfax Current meeting phone and fax information phoneandfax-* Meeting phone and fax information for * (date) schedule Schedule for 1995 meetings scope Scope of trigger group trgdc Directory with Keng-Hwee Chiam's work Sept, 95 trgdc-latency.txt DC trigger estimated latency walt-triggerLatency.ps EMC latency talk: analytical calc, Aug 31, 95