SLAC PEP-II
BABAR
SLAC<->RAL
Babar logo
HEPIC E,S & H Databases PDG HEP preprints
Organization Detector Computing Physics Documentation
Personnel Glossary Sitemap Search Hypernews
Unwrap page!
Det. Search
Who's who?
Meetings
FAQ
Images
Archive
Systems
Performance
Intern. region
Vertex Tracker
Drift chamber
DIRC
Calorimeter
IFR
LST
Magnet
Electronics
Trigger
Operations
Run Coordination
Contact Experts
Shift Takers Info
Operations Manual
Electronic Logbook
Ops Hypernews
Shift Signup
Check this page for HTML 4.01 Transitional compliance with the
W3C Validator
(More checks...)

Trigger Operation Meeting (2/12/08)

Attendees: Rainer Bartoldus, Su Dong, Rahmat Rahmat, Debbie Bard, Kim Hojeong.

Meeting Information

 Date      :  February 12th, 2008
 Time      :  2:00pm - 3:30pm PST
 SLAC Room :  Madrone conf room, ROB 
 
 Dial-in   :  1-510-665-5437, pass code 6649#

--- Minutes ---

Operations

  • A few times during last week, GLT-FCT trigger word corruption got order of 2 per mil. (A plot from 02/08/08 Day shift). It is line M*&5U. Not serious for physics. Su Dong will take a look at it.

EMT

DCT

GLT

Online

L3

DQM

  • Rahmat prepared the lumi ratio plots for Y(3S) run before Jan 5th", After Jan 5th, Even after then. We need to understand the changes in the ratios more precisely. The effects come from cross section, boost and acceptance changes.
  • Rahmat was using prescaled-path to make the ratio plots. Rainer suggested to use non-prescaled-path.

Trickle injection monitoring

Trigger Configuration

AOB

  • Monthly report draft is ready. I got many good comments. Thanks.
  • Chris fix the bug which shows element 0 all the times. He and Fang updated ROM library on Jan 18th.
  • During the first two weeks in March, Rahmat volunteered to carry the pager. Debbie will be backup for most of the time. Thanks!

This page was created by Kim Hojeong; however, you are welcome to edit and/or correct above items, specially for those who attended the meeting. Thanks.

Last Modified: Feb 12th, 2008.