SLAC PEP-II
BABAR
SLAC<->RAL
Babar logo
HEPIC E,S & H Databases PDG HEP preprints
Organization Detector Computing Physics Documentation
Personnel Glossary Sitemap Search Hypernews
Unwrap page!
Det. Search
Who's who?
Meetings
FAQ
Images
Archive
Systems
Performance
Intern. region
Vertex Tracker
Drift chamber
DIRC
Calorimeter
IFR
LST
Magnet
Electronics
Trigger
Operations
Run Coordination
Contact Experts
Shift Takers Info
Operations Manual
Electronic Logbook
Ops Hypernews
Shift Signup
Check this page for HTML 4.01 Transitional compliance with the
W3C Validator
(More checks...)

Minutes of the Trigger Operation Meeting (, 2007)

Attendees: Debbie Bard, Fang Fang, Rahmat Rahmat.

Operations

  • The detector is starting to run as per-normal again. This week has seen a couple of pages for minor things, like L3 reference plots being off. Paged Friday night for damage of ~1000 events (see LiveFastMon plots) but was paged after run had finished and problem had cleared with the start of the new run. ODF log file showed out-of-order and out-of-synch errors but no spurious interrupt messages.

EMT

  • See email from Mark here.

Online

  • Fang has been working on the teststand and has connected the ZPD to the GLT, as the ZPD power supply is now fixed. One cannot, therefore, use the teststand GLT in the current state - there are instructions attatched to the board on how to reset it if it's needed in the coming days.
  • The problem with the memory tests has been isolated in the code and Fang has a fix which works at the teststand.

Data Quality and Monitoring

  • DQ checks of Run 6 and reprocessing continues and so far so good.
  • The problem with the stripcharts has been isolated - in Italy the charts cannot be made with lines between the points, as required by the trigger plots. The connecting lines have therefore been removed in the Italian code, and Rahmat must re-mmake the trigger stripcharts himself every time.

This page is created by Debbie Bard (djbard@slac.stanford.edu); however, you are welcome to edit and/or correct above items, specially for those who attended the meeting. Thanks.