SLAC PEP-II
BABAR
SLAC<->RAL
Babar logo
HEPIC E,S & H Databases PDG HEP preprints
Organization Detector Computing Physics Documentation
Personnel Glossary Sitemap Search Hypernews
Unwrap page!
Det. Search
Who's who?
Meetings
FAQ
Images
Archive
Systems
Performance
Intern. region
Vertex Tracker
Drift chamber
DIRC
Calorimeter
IFR
LST
Magnet
Electronics
Trigger
Operations
Run Coordination
Contact Experts
Shift Takers Info
Operations Manual
Electronic Logbook
Ops Hypernews
Shift Signup
Check this page for HTML 4.01 Transitional compliance with the
W3C Validator
(More checks...)

SLAC Teststand Gas Test Results

Date last updated: 24 July, 2002 (Chris Potter) 

Notes:

  • Shipment box  is in the order received at SLAC
  • Layer in box is from top to bottom.
  • FB = First bubble.
  • FBT = First bubble test.  FBT test is time for first bubble on output bubbler for an input flow of 3 cc/minute.
  • PT = pressure test.  Pressure test checks the time to pressurize the chamber to 1 centimeter of mineral oil in a Poly-Flo tube. Input gas flow is 6 cc/minute.
  • Additionally we check that the chamber holds 1.5 cm oil pressure.  If not, the observed loss after 15 minutes is noted in parentheses.
  • The ballpark measurement error is about 10-15% on both tests.
Results for All Chambers in Boxes 1-7

 
 

Results By Box Number

Box 1

Box 2

Box 3

Box 4

Box 5

Box 6

Box 7

Box 8 Box 9 Box 10

Box 1

Chamber  Shipment box Layer in box Date of FBT  Time for FB (min.sec) Date of PT Time for PT (min.sec) Holds pressure?
TB18 1 1 12/15/01 2.30 12/16/01 1.55 Yes
TB9 1 2 12/15/01 2.10 12/16/01 1.57 Yes
TB16 1 3 12/15/01 2.10 12/16/01 1.57 Yes
TB14 1 4 12/15/01 2.35 12/16/01 2.08 Yes
TB7 1 5 12/15/01 2.05 12/16/01 2.22
Yes
TB13 1 6 12/15/01 2.08 12/16/01 2.08
Yes
TB5 1 7 12/15/01 2.25 12/16/01 2.10
Yes
TB6 1 8 12/15/01 2.12 12/16/01 1.40
Yes
TB 4 1 9 12/15/01 2.16 12/17/01 2.10
Yes
TB3 1 10 12/15/01 2.07 12/17/01 1.50
Yes
TB2 1 11 12/15/01 1.45 12/17/01 2.04
No (lost 1.9cm in 30min)
TB1 1 12 12/15/01 2.00 12/17/01 2.02
No (lost 0.5cm)

Box 2

Chamber Shipment box Layer in box Date of FBT  Time for FB (min.sec) Date of PT Time for PT (min.sec) Holds pressure?
TB15
2
1
1/29/02
2.22
1/31/02
1.25/2.40(10)
No(lost 0.5cm)
TB20
2
2
1/29/02
2.14
1/31/02
1.20/2.35
No(lost 0.3cm)
TB10
2
3
1/29/02
2.17
1/31/02
1.25/2.45
Yes
TB11
2
4
1/29/02
2.12
1/31/02
1.20/2.40
Yes
TB21
2
5
1/29/02
2.15
1/31/02
1.25/2.40
No(lost 1.3cm)
TB22
2
6
1/29/02
2.45
1/31/02
1.35/3.10
No(lost 1.5cm)
TB23
2
7
1/31/02
2.15
1/31/02
1.30/2.45
Yes
TB25
2
8
1/29/02
2.16
1/31/02
1.30/2.45
Yes
TB26
2
9
1/29/02
2.13
1/31/02
1.25/2.40
Yes
TB27
2
10
1/29/02
2.14
1/31/02
1.30/2.50
Yes

Box 3

Chamber  Shipment box Layer in box Date of FBT  Time for FB (min.sec) Date of PT Time for PT (min.sec) Holds pressure?
TB33
3
1
2/21/02
3.37
2/20/02
1.37/3.25
No(lost 1.1cm)
TB32
3
2
2/21/02
2.40
2/20/02
1.25/2.43
No(lost 0.5cm)
TB17
3
3
2/21/02
2.30
2/20/02
1.30/2.40
No(lost 0.5cm)
TB19
3
4
2/21/02
2.40
2/20/02
1.20/2.35
No(lost 0.6cm)
TB29
3
5
2/21/02
2.40
2/20/02
1.25/2.55
No(lost 0.5cm)
TB36
3
6
2/21/02
2.27
2/21/02
1.25/2.50
No(lost 0.7cm)
TB35
3
7
2/21/02
2.37
2/21/02
1.35/2.55
No(lost 0.5cm)
TB34
3
8
2/21/02
no bubble after 3min
2/21/02
no change after 2min
No(lost immediately)
TB30
3
9
2/21/02
2.27
2/21/02
1.27/2.50
No(lost 0.5cm)
TB31
3
10
2/21/02
2.20
2/21/02
1.30/2.45
No(lost 0.6cm)

Box 4

Chamber  Shipment box Layer in box Date of FBT  Time for FB (min.sec) Date of PT Time for PT (min.sec) Holds pressure?
TB24 4 1 03/28/02 2.10 03/28/02 1.14/2.34 No(lost 0.6cm)
TB44 4 2 03/28/02 2.09 03/28/02 1.23/2.46 No(lost 0.8cm)
TB43 4 3 03/28/02 2.12 03/28/02 1.20/2.45 No(lost 0.7cm)
TB42 4 4 03/28/02 2.11 04/02/02 1.16/2.41 No(lost 0.2cm)
TB41 4 5 03/28/02 2.11 04/02/02 1.21/2.41
No(lost 0.3cm)
TB40 4 6 03/28/02 2.17 04/02/02 1.19/2.32
No(lost 0.2cm)
TB39 4 7 03/28/02 2.10 04/03/02 1.06/2.22
No(lost 0.2cm)
TB38 4 8 03/28/02 2.18 04/03/02 1.09/2.25
No(lost 0.3cm)
TB28 4 9 03/28/02 2.34 04/03/02 1.07/2.25
No(lost 0.3cm)
TB37 4 10 03/28/02 2.46 04/03/02 1.04/2.15
No(lost 0.2cm)

Box 5

Chamber  Shipment box Layer in box Date of FBT  Time for FB (min.sec) Date of PT Time for PT (min.sec) Holds pressure?
TB54
5
1
3/11/02
2.03
3/11/02
1.23/2.40
Yes
TB48
5
2
3/11/02
2.18
3/11/02
1.14/2.25
Yes
TB55
5
3
3/11/02
2.07
3/11/02
1.15/2.30
No(lost 0.2cm)
TB50
5
4
3/11/02
2.13
3/11/02
1.15/2.28
No(lost 0.2cm)
TB52
5
5
3/11/02
2.22
3/11/02
1.17/2.33
Yes
TB56
5
6
3/11/02
2.11
3/11/02
1.14/2.34
No(lost 0.2cm)
TB51
5
7
3/11/02
2.01
3/11/02
1.20/2.41
Yes
TB58
5
8
3/11/02
2.24
3/11/02
1.16/2.27
No(lost 0.2cm)
TB59
5
9
3/11/02
2.10
3/11/02
1.16/2.31
Yes
TB60
5
10
3/11/02
2.24
3/11/02
1.19/2.36
Yes

Box 6

Chamber  Shipment box Layer in box Date of FBT  Time for FB (min.sec) Date of PT Time for PT (min.sec) Holds pressure?
TB8
6
1
5/21/02
2.19
5/21/02
1.04/2.34
No(lost 0.2cm)
TB45
6
2
5/21/02
2.16
5/21/02
1.14/2.31
Yes
TB46
6
3
5/21/02
2.25
5/21/02
1.10/2.26
Yes
MD3
6
4
5/21/02
2.07
5/21/02
1.09/2.23
No(lost 0.2cm)
MD2
6
5
5/21/02
2.11
5/21/02
1.07/2.18
No(lost 0.4cm)
TB49
6
6
5/22/02
2.10
5/22/02
1.39/2.56
Yes
TB57
6
7
5/22/02
2.12
5/22/02
1.15/2.28
No(lost 0.2cm)
MD1
6
8
5/22/02
2.12
5/22/02
1.06/2.18
No(lost 0.2cm)
TB47
6
9
5/22/02
2.16
5/22/02
1.11/2.27
No(lost 0.2cm)
MD4
6
10
5/22/02
2.09
5/22/02
1.10/2.25
No(lost 0.2cm)

Box 7

Chamber  Shipment box Layer in box Date of FBT  Time for FB (min.sec) Date of PT Time for PT (min.sec) Holds pressure?
MD15
7
1
6/11/02
3.03
6/11/02
2.33/4.16
No(lost 0.9cm)
MD16
7
2
6/11/02
2.55
6/11/02
2.23/4.17
No(lost 0.9cm)
MD13
7
3
6/11/02
3.10
6/11/02
2.29/4.11
No(lost 0.9cm)
MD14
7
4
6/11/02
3.17
6/11/02
2.31/4.15
No(lost 0.9cm)
TB53
7
5
6/12/02
no bubble after 5 min
6/12/02
no pressure change after 3 min
No(lost 0.9cm)
MD7
7
6
6/12/02
3.19
6/12/02
2.37/4.11
No(lost 1.0cm)
MD6
7
7
6/12/02
3.09
6/12/02
2.29/3.58
No(lost 0.9cm)
MD8
7
8
6/12/02
3.29
6/12/02
2.30/4.06
No(lost 0.9cm)
MD5
7
9
6/12/02
3.20
6/12/02
2.30/4.06
No(lost 0.9cm)
TB12
7
10
6/11/02
2.20
6/11/02
1.13/2.37
No(lost 0.9cm)

Box 8

Chamber  Shipment box Layer in box Date of FBT  Time for FB (min.sec) Date of PT Time for PT (min.sec) Holds pressure?
MD27
8
1
6/25/02
2.46
6/25/02
1.25/2.53
No(lost 0.3cm)
MD22
8
2
6/25/02
3.07
6/25/02
1.33/3.10
No(lost 0.3cm)
MD21
8
3
6/25/02
3.10
6/25/02
1.37/3.20
No(lost 0.2cm)
MD19
8
4
6/25/02
3.04
6/25/02
1.20/3.00
No(lost 0.3cm)
MD17
8
5
6/25/02
2.50
6/25/02
1.10/2.31
No(lost 0.5cm)
MD20
8
6
6/25/02
3.03
6/25/02
1.20/2.55
No(lost 0.5cm)
MD18
8
7
6/25/02
(did not bubble, broken connection)
6/25/02
   

Box 9

Chamber  Shipment box Layer in box Date of FBT  Time for FB (min.sec) Date of PT Time for PT (min.sec) Holds pressure?
MD23
9
1
6/26/02
3.13
6/26/02
1.28/3.07
No(lost 0.2cm)
MD26
9
2
6/26/02
2.33
6/26/02
1.37/3.15
No(lost 0.3cm)
MD24
9
3
6/26/02
3.20
6/26/02
1.36/3.21
No(lost 0.3cm)
MD29
9
4
6/26/02
3.26
6/26/02
1.33/3.02
No(lost 0.1cm)
MD31
9
5
6/26/02
3.31
6/26/02
1.34/3.12
No(lost 0.1cm)
MD37
9
6
6/26/02
3.33
6/26/02
1.29/3.07
No(lost 0.3cm)
MD28
9
7
6/26/02
3.42
6/26/02
1.40/3.28
No(lost 0.5cm)
MD33
9
8
6/26/02
4.35
6/26/02
1.47/3.52
No(lost 1.1cm)
MD36
9
9
6/27/02
3.18
6/26/02
1.17/2.50
No(lost 0.3cm)
MD34
9
10
6/27/02
3.13
6/27/02
1.28/2.58
No(lost 0.3cm)
MD35
9
11
6/27/02
3.07
6/27/02
1.25/2.52
No(lost 0.3cm)
MD32
9
12
6/27/02
3.10
6/27/02
1.22/2.52
No(lost 0.3cm)

Box 10

Chamber  Shipment box Layer in box Date of FBT  Time for FB (min.sec) Date of PT Time for PT (min.sec) Holds pressure?
MD30
10
1
 7/4/02
 2.44
 7/4/02
1.31/3.04 
No(lost 0.3cm) 
MD9
10
2
 7/4/02
3.02 
 7/4/02
 1.35/3.15
No(lost 0.3cm) 
MD10
10
3
 7/4/02
 3.04
 7/4/02
 1.37/3.31
No(lost 0.2cm) 
TB62
10
4
 7/4/02
 2.38
 7/4/02
 1.22/2.44
No(lost 0.2cm) 
TB64
10
5
 7/4/02
 1.45
 7/4/02
 1.19/2.39
No(lost 0.2cm) 
TB65
10
6
 7/4/02
 2.36
 7/4/02
1.20/2.48 
No(lost 0.4cm) 
TB63
10
7
 7/4/02
 2.44
 7/4/02
 1.33/3.30
No(lost 0.2cm) 
MD38
10
8
 7/4/02
 2.28
 7/4/02
 1.22/2.48
No(lost 0.2cm) 
TB61
10
9
 7/4/02
 no bubble after 6min
 7/4/02
 -

Odd

Chamber  Shipment box Layer in box Date of FBT  Time for FB (min.sec) Date of PT Time for PT (min.sec) Holds pressure?
MD11
   
 7/4/02
 3.32
 7/4/02
1.45/3.14 
No(lost 0.2cm) 
MD12
       
 
 
 
MD25
   
 7/4/02
 3.15
 7/4/02
 1.50/3.33
No(lost 0.5cm) 

Notes:

  1. Box 1 first bubble and pressure tests done by David Lange
  2. Box 2,3,4,5,6,7 first bubble and pressure tests done by Chris Potter
  3. Box 8 and 9 first bubble and pressure tests done by Matt, Charlotte, Eric and Matt. 
  4. Box 10 first bubble and pressure tests done by Eric Fitzgerald. 
Date created: December 17, 2001 (Lange)