SLAC PEP-II
BABAR
SLAC<->RAL
Babar logo
HEPIC E,S & H Databases PDG HEP preprints
Organization Detector Computing Physics Documentation
Personnel Glossary Sitemap Search Hypernews
Unwrap page!
Det. Search
Who's who?
Meetings
FAQ
Images
Archive
Systems
Performance
Intern. region
Vertex Tracker
Drift chamber
DIRC
Calorimeter
IFR
LST
Magnet
Electronics
Trigger
Operations
Run Coordination
Contact Experts
Shift Takers Info
Operations Manual
Electronic Logbook
Ops Hypernews
Shift Signup
Check this page for HTML 4.01 Transitional compliance with the
W3C Validator
(More checks...)

IFR Online Detector Control

20 January 2000


The hardware Detector Control system has been:
  • designed in the 1996;
  • approved in the 1997 by the BaBar collaboration;
  • built and tested during the 1997-1998;
  • installed on BaBar during the 1998-1999.
The Hardware Detector Control group is:
 
Nicola Cavallo (INFN Naples)
Saverio Minutoli (INFN Genoa)
Pigi Paolucci (SLAC/Naples)  -coordinator-
Luigi Parascandolo (INFN Naples)
Marcello Piccolo (INFN Frascati)

The software Detector Control has been developed by Pierluigi Paolucci during the 1998-1999.

The IIFR Online Detector Control is working since the first Cosmic Run (November 1998).


IFR Online Detector Control schema

In the following liks you can find a full description of the IODC system:



 
Some IODC Pictures



For comments, questions, or changes to this page contact Pierluigi Paolucci