IFR Online Detector Control
20 January 2000
The hardware Detector Control system has
been:
-
designed in the 1996;
-
approved in the 1997 by the BaBar collaboration;
-
built and tested during the 1997-1998;
-
installed on BaBar during the 1998-1999.
The Hardware Detector Control group is:
| Nicola Cavallo (INFN Naples) |
| Saverio Minutoli (INFN Genoa) |
| Pigi Paolucci (SLAC/Naples) -coordinator- |
| Luigi Parascandolo (INFN Naples) |
| Marcello Piccolo (INFN Frascati) |
The software Detector Control has been developed
by Pierluigi Paolucci during the 1998-1999.
The IIFR Online Detector Control is working since the first
Cosmic Run (November 1998).
IFR Online Detector
Control schema
In
the following liks you can find a full description of the IODC system:
For comments, questions, or changes to this page contact
Pierluigi
Paolucci
|