The procedure to be followed for the IFR, in case of a Brown Out, is:
- Switch IFR HV OFF(through the EPICS panel)
- Switch IFR LV OFF (in the Electronics House)
- Leave IFR Chillers ON
- Leave FEE crates ON
- Leave Monitoring system ON