|
Date |
Title |
| 143 |
October 2002 |
Calibration of the Dirc DFB charge measurement |
Mir
Shelkov
Zito
|
| 142 |
December 2001 |
Operational Experience with the DIRC Detector |
Schwiening
|
| 141 |
September 2001 |
Photon Background in DIRC Fused Silica Bars |
Yarritu,
Spanier,
Va'vra
|
| 140 |
July 2001 |
Measurement of EPOTEK-301-2 Optical Glue Refraction Index and a
Reflectivity from EPOTEK-301-2/Fused Silica Interface |
Va'vra
|
| 139 |
February 2001 |
Operation of the Cherenkov Detector DIRC of BaBar at High Luminosity |
Spanier
|
| 138 |
November 2000 |
An Indirect Study of Gas Tightness of the DIRC Bar Boxes |
Telnov
|
| 137 |
August 2000 |
DIRC, the Particle Identification System for BaBar |
Schwiening
|
| 136 |
October 2000 |
Corrosion of Glass Windows in DIRC PMTs |
Bourgeois,
Vavra
|
| 135 |
June 2000 |
The DIRC Timing |
Hoecker,
Lacker,
Roos,
Schwiening,
Shelkov,
Spanier,
Zito
|
| 134 |
April 2003 |
An Event Likelihood Algorithm for DIRC Based Particle Identification |
Mancinelli
|
| 133 |
April 2000 |
First Year Operational Experience with the Cherenkov Detector (DIRC) of BaBar |
Spanier
|
| 132 |
12 September 2000 |
Development of a Digital Microscope for the DIRC Quartz Bar Quality Control |
Cohen-Tanugi,
Convery,
McCulloch,
Reif,
Schwiening,
Va'vra |
| 131 |
13 April 2000 |
Study of the Internal Reflection Coefficient of DIRC Bars as a Function of Quartz Surface Pollution |
Cohen-Tanugi,
Schwiening,
Va'vra |
| 130 |
2 May 2000 |
Measurements of Periodic Structure in Synthetic Quartz |
Convery,
Ratcliff,
Schwiening,
Va'vra |
| 129 |
12 April 2000 |
Quartz Absolute Internal Reflection Coefficient, Water Transmission, Mirror Reflectivity, Mean Wavelength Response, Mean Refraction Index, and Their Effect on the Expected Number of Photoelectrons and No |
Va'vra |
| 128 |
March 2000 |
A Maximum Likelihood Method For DIRC Particle Identification: Formalism and Analysis Results |
Hoecker |
| 127 |
8 March 2000 |
Using Global Likelihood to Compare DIRC PID Hypotheses |
Yellin |
| 126 |
18 Aug 99 |
Some Remarks on Indices of Bars 132-143 |
de Lesquen |
| 125 |
1 Jul 99 |
Study of the DIRC Background Duriing the First BaBar Cosmic Run |
Benkebil,
Wormser |
| 124 |
28 Apr 99 |
Proposal for EPICS Readout of the DIRC Gas/Water Safety System |
Telnov |
| 123 |
28 Apr 99 |
Electronics for the DIRC Safety System |
Telnov |
| 122 |
19 Apr 99 |
The First DIRC Bar Box |
Cohen-Tanugi,
Convery,
Schwiening,
Va'vra |
| 120 |
15 Mar 99 |
Gaseous Leak Tightness of the S.O.B. |
Bourgeois |
| 119 |
23 Mar 99 |
Results of the Tests of the Optical Fibers and the Diffuser for the DIRC Calibration System |
Bourgeois, Karolak, Zito |
| 118 |
15 Mar 99 |
The Light Generator Crate of the DIRC Calibration System |
Bourgeois,
Karolak,
Mouly |
| 117 |
1 Feb 99 |
A 16-Channel Digital TDC Chip with Internal Buffering and Selective Readout for the DIRC Cherenkov Counter of the BaBar Experiment |
Bailly, Chauveau, Genat, Huppert, Lebbolo, Roos, Zang Bo |
| 116 |
5 Jan 99 |
Results of the PMT sector test at Saclay |
Bourgeois, Herve, Hoecker, Karolak,
Roos, Wormser, Zito |
| 115 |
28 Oct 98 |
DIRC Parallel Sessions - October 28-29, 1998 |
|
| 114 |
26 Oct 98 |
DIRC Status Report |
Ratcliff |
| 113 |
14 Jul 98 |
DIRC Parallel Sessions - July 14, 1998 |
|
| 112 |
12 Oct 98 |
Effect of helium on phototubes |
Bourgeois, Karolak, Vasseur |
| 111 |
9 Sep 98 |
Test of Magnetic Field Control System for the DIRC Detector |
Ganzhur, London, Oxoby, Vasileiadis, Wormser |
| 110 |
26 Jun 98 |
Magnetic Field Control for the DIRC Detector |
Chupyra, Ganzhur, Litvinov, Medvedko, Onuchin, Singatulin |
| 106 |
11 Jun 98 |
PMTs in a magnetic field: use of mu-metal and effect of a longitudinal field |
Bourgeois, Karolak, Vasseur |
| 105 |
29 May 98 |
Systematic tests of DIRC phototubes |
Bourgeois, Herve, Karolak, Piret, Rolquin, Vasseur |
| 104 |
17 Apr 98 |
Pressure Relief Valve for the DIRC Dry Nitrogen System |
Kadel, Kuiper, Stone, Telnov, Weber |
| 103 |
7 May 98 |
Strong Support Tube Strain Gage Measurements |
Oshatz |
| 102 |
17 Apr 98 |
BaBar Quarterly Progress Report (Jan 1 - Mar 31, 1998) |
Ratcliff |
| 101 |
25 Jan 98 |
User Manual for DIRC Magnetic Field Measurement System |
Buzykaev, Chupyra, Fedorov, Ganzhur, Kolachev, Litvinov, Medvedko, Mikerov, Mikhailov, Onuchin, Singatulin |
| 100 |
11 Mar 98 |
Test and Selection of Digital Chips for the final DIRC Front-End Electronics |
Bailly, Chauveau, Genat, Huppert, Lebbolo, Roos, Zang Bo |
| 99 |
12 Mar 98 |
DIRC Parallel Session Schedule - March 3-4, 1998 |
|
| 98 |
23 Jan 98 |
BaBar Quarterly Progress Report (Oct 1 - Dec 31, 1997) |
Ratcliff |
| 97 |
17 Jan 98 |
Description of the Dry Nitrogen System of the DIRC |
Kadel, Vasileiadis |
| 96 |
10 Dec 97 |
DIRC, a New Type of Particle Identification System for BaBar |
Schwiening |
| 95 |
13 Nov 97 |
An Internally Reflecting Cherenkov Detector (DIRC): Properties of the Fused Silica Radiators |
I. Adam et al. |
| 94 |
29 Sep 97 |
Development of a VLSI TDC for DIRC |
Zang Bo |
| 93 |
13 Nov 97 |
DIRC, the Internally Reflecting Ring Imaging Cherenkov Detector for BaBar |
I. Adam et al. |
| 92 |
17 Nov 97 |
DIRC Parallel Session Schedule - November 17-20, 1997 |
|
| 91 |
11 Nov 97 |
BaBar DIRC Electronics Front-End Chain |
DIRC Electronics Group |
| 90 |
29 Aug 97 |
DIRC Digital Chip Preproduction Tests Results |
Bailly, Chauveau, Genat, Huppert, Lebbolo, Roos, Zang Bo |
| 89 |
30 Sep 97 |
BaBar Quarterly Progress Report (Jul 1 - Sep 30, 1997) |
Ratcliff |
| 88 |
17 Oct 97 |
Driving DIRC |
Oxoby |
| 85 |
30 Jun 97 |
BaBar Quarterly Progress Report (Apr 1 - Jun 30, 1997) |
Ratcliff |
| 84 |
4 June 97 |
Tests of the metallization of ultem plaquettes |
Plaszczynski, Schune, |
| 82 |
9 Sep 97 |
Quality Control Results for Heraeus-Amersil Suprasil Bars |
Schwiening |
| 81 |
19 May 97 |
DIRC High Voltage System Specifications |
Bonneaud, Matricon, Vasileiadis |
| 80 |
15 May 97 |
BaBar Progress Report (April 1997) |
Ratcliff |
| 79 |
|
Mechanical and Seismic FEA for the SOB |
Convert |
| 78 |
13 Mar 97 |
Test of Materials in Pure Water |
Ageron, Besson, Bourgeois, Le Meur, de Lesquen, Penichot |
| 77 |
21 Apr 97 |
BaBar Quarterly Progress Report (Jan 1 - Mar 31, 1997) |
Ratcliff |
| 76 |
21 Apr 97 |
BaBar Progress Report (Mar 1997) |
Ratcliff |
| 75 |
9 Apr 97 |
Diffraction from an Oscillating Refractive Index |
Yellin |
| 74 |
9 Apr 97 |
Support Structure Bolting and Pinning |
Oshatz |
| 73 |
25 Mar 97 |
Support Structure Technical Specification |
Oshatz |
| 72 |
19 Mar 97 |
Test of a Large Scale Prototype of the DIRC, a Cherenkov Imaging Detector Based on Total Internal Reflection for BaBar at PEPII |
H. Staengle et al. |
| 71 |
20 Mar 97 |
BaBar Progress Report (Feb 1997) |
Ratcliff |
| 70 |
25 Feb 97 |
BaBar Progress Report (Jan 1997) |
Ratcliff |
| 69 |
3 Feb 97 |
BaBar Quarterly Progress Report (Oct 1 - Dec 31, 1996) |
Ratcliff |
| 68 |
29 Jan 97 |
The effect of the new drift chamber endplate on DIRC performance |
Sen |
| 67 |
16 Jan 97 |
BaBar Progress Report (Dec 1996) |
Ratcliff |
| 66 |
11 Dec 96 |
BaBar Progress Report (Nov 1996) |
Ratcliff |
| 65 |
2 Dec 96 |
Honeycomb Panel Bending Tests |
Long, Kadel |
| 64 |
2 Dec 96 |
EPDM Diaphragm Mechanical Test |
Weber, Kadel |
| 63 |
2 Dec 96 |
Bar Box Window Sealants, Rhodasil 581 |
Weber, Kadel |
| 62 |
2 Dec 96 |
DIRC Bar Box Assembly Procedure |
Kadel |
| 61 |
|
DIRC Parallel Sessions - SLAC (October 20-23, 1996) |
|
| 60 |
19 Nov 96 |
DIRC Final Design Review |
|
| 59 |
15 Nov 96 |
DIRC: A New Type of Cherenkov Ring Imaging Detector |
Kadyk |
| 58 |
11 Nov 96 |
BaBar Progress Report (Oct 1996) |
Ratcliff |
| 57 |
28 Oct 96 |
BaBar Quarterly Progress Report (July 1 - Sept 30, 1996) |
Ratcliff |
| 56 |
30 Oct 96 |
BaBar Progress Report (Sept 1996) |
Ratcliff |
| 54 |
11 Oct 96 |
The Optical Scanning System for the Quartz Bar Quality Control |
Krueger, Reif, Sarazin, Schwiening, Va'vra |
| 53 |
2 Oct 96 |
Measurements on Photomultiplier Tubes in a Magnetic Field |
Bourgeois, Karolak, Mayer, Vasseur |
| 52 |
25 Sep 96 |
BaBar Progress Report (August 1996) |
Ratcliff |
| 51 |
12 Sep 96 |
BABAR DIRC Design Review, June 10-12, 1996 |
|
| 50 |
15 Aug 96 |
Study of the Squareness and Straightness of the DIRC Radiator Bars |
Kawahara |
| 49 |
3 Sep 96 |
BaBar Progress Report (July 1996) |
Ratcliff |
| 48 |
1 Aug 96 |
DIRC Parallel Sessions - Dresden (July 1518, 1996) |
|
| 47 |
1 Aug 96 |
BaBar Quarterly Progress Report (April 1 - June 31, 1996) |
Ratcliff |
| 46 |
30 July 96 |
BaBar Progress Report (June 1996) |
Ratcliff |
| 45 |
30 July 96 |
BaBar Progress Report (May 1996) |
Ratcliff |
| 44 |
20 Aug 96 |
Test of the material for the socket of DIRC photomultiplier tubes |
Benkebil, Schune, Sen, Wormser |
| 43 |
11 April 96 |
Proposal to Measure DIRC Backgrounds During Commissioning |
Sokoloff, Kadyk |
| 42 |
3 July 96 |
Testing Particle Hypothesis with the DIRC |
Plaszczynski, |
| 41 |
20 June 96 |
An Alternative Method to Measure Theta_c in the DIRC |
De la Vaissiere, Briand |
| 40 |
20 May 96 |
Measuring the Optical Quality of Quartz Bars and the Coupling of RTV to the Window |
Krueger, Reif, Sarazin, Schwiening, Va'vra |
| 39 |
31 May 96 |
Radiation Damage of Synthetic Quartz and Optical Glues |
Sarazin, McCulloch, Schneider, Schwiening, Reif, Va'vra |
| 38 |
15 May 96 |
BaBar Progress Report (April 1996) |
Ratcliff |
| 37 |
25 Apr 96 |
SOB Preliminary Design Review Talks |
|
| 36 |
26 Apr 96 |
DIRC Presentations at the April BaBar Collaboration Meeting |
|
| 35 |
11 Apr 96 |
Particle Identification for the BaBar Experiment: DIRC |
Wilson |
| 34 |
15 Apr 96 |
BaBar Progress Report (March 1996) |
Ratcliff |
| 33 |
29 Mar 96 |
Test of 400 Photomultiplier Tubes for the DIRC Prototype II |
Staengle, Warner, Wilson |
| 32 |
29 Mar 96 |
PMT specifications and EMI 9125 |
Saclay Group |
| 31 |
7 Mar 96 |
BaBar Progress Report (February 1996) |
Ratcliff |
| 30 |
22 Feb 96 |
Review Materials from DIRC + ATC: Preliminary Design Requirements Review and Conceptual Design Review |
|
| 29 |
20 Feb 96 |
DIRC Electronic Requirements |
DIRC Electronics Group |
| 28 |
13 Feb 96 |
Results from DIRC-Prototype II.5 for Periods 4&5 Beam-Tests |
Benkebil, Wormser |
| 27 |
12 Feb 96 |
BaBar Progress Report (January 1996) |
Ratcliff |
| 26 |
20 Feb 96 |
Further Measurements of Photomultipler Tubes |
Bourgeois, Karolak, Vasseur |
| 25 |
26 Feb 96 |
Report on the DIRC LED Calibration System |
Bourgeois, Brown, Chauveau, Del Buono, Genat, Lory,
Kadyk, Mouly, Przybinski, Zito |
| 24 |
1 Feb 96 |
DIRC Presentations at the BaBar Collaboration Meeting and DIRC Conceptual Design Review Talks |
|
| 23 |
29 Jan 96 |
DIRC Mechanical/Engineering Review |
|
| 22 |
23 Jan 96 |
Results from DIRC-Prototype II for 3rd Period Beam-Test |
Benkebil, Wormser |
| 21 |
10 Dec 95 |
BaBar Progress Report (November 1995) |
Ratcliff |
| 20 |
5 Jan 96 |
OODIRC: an Object Oriented project for the reconstruction of DIRC date |
Benkebil, Du, Lutz, Plaszczynski, Schune |
| 19 |
5 Jan 96 |
StandOff Box Assembly and Test Schedule |
London, Bourgeois |
| 18 |
5 Jan 96 |
Initial Measurements of Quartz Transmission, Internal Reflection Coefficient and the Radiation Damage |
Krueger, Schneider, Reif, Va'vra |
| 17 |
20 Nov 95 |
Talk Presented at the IEEE Meeting |
Brown |
| 16 |
13 Nov 95 |
Proposal for a DAR and Online Test Stand for the DIRC |
Brown, Oxoby |
| 15 |
13 Nov 95 |
BaBar Progress Report (October 1995) |
Ratcliff |
| 14 |
13 Nov 95 |
BaBar Progress Report (April-September 1995) |
Ratcliff |
| 13 |
18 Oct 95 |
Reflectors for the DIRC Final Design? |
Plaszczynski |
| 12 |
18 Oct 95 |
Second Review of DIRC Mechanics,
Integration, and Installation |
|
| 11 |
3 Oct 95 |
Collection Rings for DIRC Phototubes |
Lynch |
| 10 |
28 Sep 95 |
The TDC System for DIRC Proto-II Hardware Description and Performances |
Plaszczynski, Schune, Wormser |
| 9 |
28 Sep 95 |
DIRC Presentations |
|
| 8 |
21 Sep 95 |
Test of Photomultiplier Tubes for the DIRC (Superceding BaBar DIRC Note 5) |
Bourgeois, Emery, Gaidot, Karolak, Vasseur, Beschastnov |
| 7 |
12 Sep 95 |
Fitting to a DIRC Cherenkov Ring |
Lynch |
| 6 |
8 Sep 95 |
Minutes of DIRC Video Meeting
September 8, 1995 |
|
| 5 |
6 Sep 95 |
Test of Photomultiplier Tubes for the DIRC |
Bourgeois, Gaidot, Karolak, Vasseur, Beschastnov |
| 4 |
30 Aug 95 |
Minutes of DIRC Video Meeting
August 30, 1995 |
|
| 3 |
23 Aug 95 |
Propagation of Photons Induced by a Proton Beam in a Quartz Bar |
Besson, Bourgeois, Plaszczynski, Wormser |
| 2 |
28 Jul 95 |
Minutes of DIRC Video Meeting July 27, 1995 |
London |
| 1 |
21 Jul 95 |
Preliminary Analyses of DIRC Prototype 2 CERN Data |
Hamel de Monchenault, Zito |