DIRC Operations Weekly Report

Period: Wednesday 2007/4/10 - Wednesday 2007/4/17

Oncall: Alejandro Perez
Fast Monitoring: Alejandro Perez, Bradley Wogsland

File location: $BFROOT/www/Detector/DIRC/WeeklyReports/report_20070417.html
Plot directory: $BFROOT/www/Detector/DIRC/WeeklyReports/Plots/report_20070417

Contents


BaBar-PEP news

PEP peak lumi: ~1. x 1034 (previous week: ~8.3 x 1033)

BaBar integrated lumi: 3.28 fb-1 (previous week: 0.80 fb-1)

Run 6 PEP delivery: 3.43 fb-1 (previous week: 0.92 fb-1)

Run 6 total delivery: ~28.42 fb-1 Run 6 total BaBar recorded: 27.25 fb-1 including 0 fb-1 off-peak data

PEP activities this week:

  • 2007/04/13: Problems during the swing shift, PEP was trying to put HER RF 12-6 online, and the same problem for LER RF 4-2 during owl.
  • 2007/04/16: Problem during night in the BSY region.
  • 2007/04/17: In the morning, PEP needed access to region 4 to fix magnet problems.

    BaBar activities/issues this week:

  • none

    DIRC activities

    See DIRC logbook for details

    Backgrounds

    Scheduled activities

    Pending Work

    Manpower situation

    Jose, Alejandro and Bradley rotating backup & on-call commissioning duties.

    Links