DIRC Operations Weekly Report

Period: Wednesday 2007/03/06 - Wednesday 2007/03/13

Oncall: Alejandro Perez
Fast Monitoring: Alejandro Perez, Bradley Wogsland

File location: $BFROOT/www/Detector/DIRC/WeeklyReports/report_20070313.html
Plot directory: $BFROOT/www/Detector/DIRC/WeeklyReports/Plots/report_20070221

Contents


BaBar-PEP news

PEP peak lumi: ~8.1 x 1033 (previous week: ~8.3 x 1033)

BaBar integrated lumi: ~1.7 (previous week: ~3.1 fb-1)

Run 6 PEP delivery:~1.7 (previous week: ~3.3 fb-1)

Run 6 total delivery: 14.9 fb-1 Run 6 total BaBar recorded: 14.4 fb-1 including 0 fb-1 off-peak data

PEP activities this week:

  • On March 13 (day shift) some MD studies.

    Foreseen work opportunities (PEP down periods):

  • 3 days ROD begining on March 26. Backward door are going to be close, no expected DIRC work.

    BaBar activities/issues this week:

    DIRC activities

    See DIRC logbook for details

    Backgrounds

    Scheduled activities

    Pending Work

    Manpower situation

    Bradley, Jose and Alejandro rotating backup & on-call commissioning duties

    Links