DIRC Operations Weekly Report

Period: Wednesday 2007/03/01 - Wednesday 2007/03/06

Oncall: Alejandro Perez
Fast Monitoring: Alejandro Perez, Bradley Wogsland

File location: $BFROOT/www/Detector/DIRC/WeeklyReports/report_20070306.html
Plot directory: $BFROOT/www/Detector/DIRC/WeeklyReports/Plots/report_20070221

Contents


BaBar-PEP news

PEP peak lumi: ~8.3 x 1033 (previous week: ~8.2 x 1033)

BaBar integrated lumi: ~3.1 (previous week: ~3.2 fb-1)

Run 6 PEP delivery:~3.3 (previous week: ~3.3 fb-1)

Run 6 total delivery: 13.2 fb-1 Run 6 total BaBar recorded: 12.7 fb-1 including 0 fb-1 off-peak data

PEP activities this week:

  • MD on March 5. PEP was testing relationship between Background and beam parameters.

    Foreseen work opportunities (PEP down periods):

  • 3 days ROD begining on March 26. Backward door are going to be close, no expected DIRC work.

    BaBar activities/issues this week:

    DIRC activities

    See DIRC logbook for details

    Backgrounds

    Scheduled activities

    Pending Work

    Manpower situation

    Bradley, Jose and Alejandro rotating backup & on-call commissioning duties