DIRC Operations Weekly Report

Period: Wednesday 2007/2/7 - Wednesday 2007/2/14

Oncall: Jose Benitez
Fast Monitoring: Jose Benitez, Alejandro Perez

File location: $BFROOT/www/Detector/DIRC/WeeklyReports/report_20070214.html
Plot directory: $BFROOT/www/Detector/DIRC/WeeklyReports/Plots/report_20070214 (empty)

Contents


BaBar-PEP news

PEP peak lumi: 7.1 x 1033 (previous week: ~5.8 x 1033)

BaBar integrated lumi: 2.3 (previous week: ~2.3 fb-1)

Run 6 PEP delivery:2.4 (previous week: ~2.4 fb-1)

Run 6 total delivery: 4.8 fb-1 Run 6 total BaBar recorded: 4.7 fb-1 including 0 fb-1 off-peak data

PEP activities this week:

  • ROD Feb 13.

    Foreseen work opportunities (PEP down periods):

    BaBar activities/issues this week:

  • ROD Feb 13.
  • Cooling tower broke on Feb 12, HV had to be turned off (no temperature changes were noticed in the DIRC).

    DIRC activities

    See DIRC logbook for details

    Backgrounds

    Scheduled activities

    Pending Work

    Manpower situation

    Bradley and Jose rotating backup & on-call commissioning duties; Alejandro working doubletime soon.