DIRC Meeting Operations Report

Period: Wednesday 2007/4/24 - Wednesday 2007/5/23

Oncall: Alejandro Perez
Fast Monitoring: Alejandro Perez, Bradley Wogsland, Jose Benitez
Plot directory: $BFROOT/www/Detector/DIRC/WeeklyReports/Plots/report_20070523

File location: $BFROOT/www/Detector/DIRC/WeeklyReports/DIRCmeeting_20070523.html

Contents


BaBar-PEP news

PEP peak lumi: ~8.0 x 1033 (previous week: ~7.0 x 1033)

BaBar integrated lumi: 1.84 fb-1 (previous week: 0.0 fb-1)

Run 6 PEP delivery: 1.97 fb-1 (previous week: 0.0 fb-1)

Run 6 total delivery: ~34.37 fb-1 Run 6 total BaBar recorded: ~33.04 fb-1 including 0 fb-1 off-peak data

PEP activities since last DIRC meeting: