FDR Documentation
Calorimeter Electronics Final Design Review, Dec 10 1997
The Calorimeter Electronics Final Design Review date is December 10, 1997, at SLAC.
Review Committee
Agenda
Documentation:
- System Description
- Block Diagrams and Schematics
- Digitizing Board (ADB): Description
- ADB Schematics: Schematic (A3 PS)
- ADB Layouts: [ top , bottom ]
- I/O Board (BIOB and EIOB): Description
- IOB Schematics: [Barrel IOB (A3 PS) , Endcap IOB (A3 PS) ]
- IOB Layouts: [ Barrel IOB top , Barrel IOB bottom , Endcap IOB
top , Endcap IOB bottom ]
- Fanout Boards (BFOB and EFOB) [Description, Endcap FOB schematic , Endcap FOB Layout , Barrel Crate Mechanical Drawings ]
- Transition Board (TRB): Description
- TRB Schematic: [ Sheet 1 , Sheet 2 , Sheet 3 , Sheet 4 , Sheet 5 , Sheet 6 , Sheet 7 , Sheet 8 ]
- Environmental Monitoring Board: [Description, EMB Current Status , GMB Current Status ]
- EMB and GMB: [ EMB Conceptual Layout , GMB Conceptual Layout ]
- Custom Backplane: Writeup
- External Interface Specifications Documents
- Grounding, Shielding and Power
- Deliverables, Cost and Schedule
- Design Changes since the PDR
- Test Results
- Quality Assurance Plan
- Reliability Analysis
- Cooling and Access Plan
- Cable Specifications
- Power Supplies
- Requirements and Other Backup Documents
Materials requested
List of review materials needed for FDR (text) Andy Lankford, Feb 1997
Last Updated on 12/9/97
By Jordan Nash
Email: jan@slac.stanford.edu
|