| Procedure |
Source |
Date/Version |
| What to do if there is a DCh gas alarm |
HTML |
|
| What to do if there is a DCh chiller alarm |
HTML |
|
| What to do before a long term shutdown |
PDF |
2007-07-18 |
| Back from a long term shutdown. What to do? |
HTML |
2007-07-18 |
| Replacement of the DCH Chiller pump |
PDF |
2007-07-18 |
| Purging and drying the chiller |
PDF |
2007-07-18 |
| Recovering From a Gas Alarm |
PDF |
2007-07-18 |
| Gas System Alarm Checklist |
PDF |
2007-07-18 |
| Gas System Chiller Alarm Checklist |
PDF |
2007-07-18 |
| Nanoautomate Certification Procedure |
PDF |
2007-07-18 |
| Lock-and-Tag: Drift Chamber Electronics Power Supply |
PDF |
2007-07-18 |
| Lock Procedure: Drift Chamber High Voltage Supply |
PDF |
2007-07-18 |
| Description |
Source |
Date/Version |
| Initial Checkout (set system to rest mode) |
PDF |
2007-07-18 |
| Running Mode to Rest (He:Iso) |
PDF |
2007-07-18 |
| Purging Drift Chamber |
|
|
| Rest (He:Iso) to Rest (Helium) |
PDF |
2007-09-05 |
| Rest (O2 Present) to Rest (Helium) |
PDF |
2007-07-18 |
| Rest (Helium) to Rest (air) (includes filling chamber with air for
repairs) |
PDF |
2007-07-18 |
| Rest (Helium) to 1 Atmosphere - For repair |
PDF |
2007-07-18 |
| Restarting Drift Chamber |
|
|
| Rest (Helium) to Rest (He:Iso) |
PDF |
2007-07-18 |
| Rest (He:Iso) to Running Mode (He:Iso) |
PDF |
2007-07-18 |
| Drift Chamber to Cold Stand By |
|
|
| DCH Electonics shut down |
PDF |
2008-08-07 |
| DCH Gas shut down with air purge |
PDF |
2008-08-07 |
| DCH Gas shut down no air purge needed |
PDF |
2008-09-05 |
| Chapter |
Description |
Source |
Date/Version |
| Chapter 1 |
Changes to gas system design since September 1998 |
PDF |
1999-4-7 |
| Chapter 2 |
Responses to HEEC preoperational approval action items |
PDF |
1999-4-7 |
| Chapter 3 |
Design of the gas system |
PDF |
1999-4-9 |
|
Gas system drawing
|
PDF |
1999-4-9 |
| Chapter 4 |
Gas system operation and maintenance |
PDF |
1999-4-9 |
| Chapter 5 |
Gas system alarms and alarm handler (nanoauomate) |
PDF |
2000-10-2 |
|
Nanoautomate program certification
|
PDF |
1999-4-20 |
|
Gas system alarm checklist
|
PDF |
2006-12-12 |
| Chapter 6 |
Chiller-electronics cooling safety |
PDF |
1999-4-7 |
|
Checklist for cooling system testing |
PDF |
2003-08-20 |
| Chapter 7 |
SIAMs |
PDF |
2003-8-22 |
| Chapter 8 |
Annunciator alarms |
PDF |
1999-4-7 |
|
What to do if there is a gas system alarm
|
HTML |
|
|
What to do if there is a chiller alarm
|
HTML |
|
| Chapter 9 |
Access to drift chamber electronics: confined space |
PDF |
1999-4-7 |
|
Access checklist: permit required confined space
|
PDF |
1999-4-7 |
|
Access checklist: confined space permit not required
|
PDF |
1999-4-7 |
| Chapter 10 |
Electrical safety |
PDF |
1999-4-7 |
|
Lock and tag for LV power supply
|
PDF |
1999-4-1 |
|
Lock off for HV supply
|
PDF |
1999-4-1 |