Highlights, Thumbnails, Descriptions


Highlights

Picture of rear endplate near completion of drilling. Spot drilling for grounding posts. Forward endplate machining and inspection photographs here and here. A picture of the test drilling plate can be found here. Also, other endplate machining pictures are here, here, here, and here

Pictures of beryllium section of the inner cylinder are here, here, here, and here

Pictures of the first wire installed in the DCH at 4pm PDT on August 18 are here, here, and here.

Final wires installed on November 28 at 6pm PST, with photographs here, here, here, here, here, and here.

64ffeetu.gif (1651 bytes) Back to top


Thumbnails

babar1.jpg
babar1.jpg

474.65 Kb
babar2.jpg
babar2.jpg

332.22 Kb
babar3.jpg
babar3.jpg

422.53 Kb
babar4.jpg
babar4.jpg

382.91 Kb
babar5.jpg
babar5.jpg

370.20 Kb
babar6.jpg
babar6.jpg

473.92 Kb
img001r.jpg
img001r.jpg

711.09 Kb
img002.jpg
img002.jpg

350.76 Kb
img003.jpg
img003.jpg

815.85 Kb
img004r.jpg
img004r.jpg

613.45 Kb
img005r.jpg
img005r.jpg

780.63 Kb
img006.jpg
img006.jpg

375.80 Kb
img007r.jpg
img007r.jpg

883.98 Kb
img008r.jpg
img008r.jpg

652.47 Kb
img009r.jpg
img009r.jpg

638.41 Kb
img010r.jpg
img010r.jpg

593.96 Kb
img011r.jpg
img011r.jpg

822.55 Kb
img012r.jpg
img012r.jpg

764.06 Kb
img013a.jpg
img013a.jpg

294.35 Kb
img013b.jpg
img013b.jpg

303.67 Kb
Snap01.jpg
Snap01.jpg

165.44 Kb
Snap02.jpg
Snap02.jpg

148.69 Kb
Snap03.jpg
Snap03.jpg

163.71 Kb
Snap04.jpg
Snap04.jpg

146.95 Kb
Snap05.jpg
Snap05.jpg

169.75 Kb
Snap06.jpg
Snap06.jpg

172.20 Kb
Snap07.jpg
Snap07.jpg

184.50 Kb
Snap08.jpg
Snap08.jpg

183.12 Kb
Snap09.jpg
Snap09.jpg

153.69 Kb
Snap10.jpg
Snap10.jpg

128.78 Kb

64ffeetu.gif (1651 bytes) Back to top


Descriptions

  • Photo 1: Nando Ferroni and Jonathan Dorfan surveying wire transport robots in TRIUMF clean room
  • Photo 2: Stringer training with mockup at TRIUMF
  • Photo 3: Richard Fernholz, Jonathan Dorfan, Robert Henderson discussing stringing procedures in front of robots at TRIUMF
  • Photo 4: Mauro Morganti and Andrea Gaddi in front of chamber after test installation of outer cylinder
  • Photo 5: Magnet coil for tension measurement
  • Photo 6: Changguo Lu surveying tension measuring magnets
  • Photo 7: Endplate test sector with installed feedthroughs and extraction tooling
  • Photo 8: Test insertion of chamber structure between transport robots
  • Photo 9: Richard Fernholz, Mauro Morandin, and Robert Henderson surveying installed chamber structure
  • Photo 10: Andrea Gaddi and Mauro Morganti test installing second outer cylinder panel, with full tension load on endplates
  • Photo 11: Chris Hearty and Mike Kelsey applying tension load to endplates
  • Photo 12: Software engineers Sandra Santi and Roberto with Silvio Morganti testing robot operations
  • Photo 13: Closeup of robot arm with magnetic gripper
  • Photo 14: TRIUMF clean room with assembly fixture, installed chamber structure, and wire transport robots
  • Photo 15: Robert Henderson and Richard Fernholz making a test hoist of mobile assembly fixture from top of fixed frame
  • Photo 16: Closeup of Robert Henderson and Richard Fernholz hoisting mobile assembly frame
  • Photo 17: TRIUMF physicist crew on top of fixed assembly fram
  • Photo 18: Richard Fernholz with side view of partially hoisted mobile frame
  • Photo 19: Mike Kelsey inserting central shaft into assembled chamber endplates and inner cylinder
  • Photo 20: Test hoist of chamber structure in mobile assembly frame
  • Photo 21: Closeup of spiders, tension rods, cables, and measurement equipment for endplate deflection test
  • Photo 22: Mike Kelsey taking deflection measurement on endplate
  • Photo 23: Physicist and stringer crew after completion of stringing at TRIUMF
  • Photo 24: Day crew after completion of last shift on November 28
  • Photo 25: Installation of final wire by evening crew on November 28
  • Photo 26: After completion of final wire insertion on November 28
  • Photo 27: View of completed wire field
  • Photo 26: Start of installation of final wire by evening crew on November 28

64ffeetu.gif (1651 bytes)  Back to top

 

For comments, questions or changes to this page contact David MacFarlane mailb2.gif (2499 bytes)