|
| |
DCH Shifts Quota by Institution
Latest Update: 20-JUN-2000
Run
period: |
1/5/2000-10/31/2000 |
|
|
|
|
Shifts: |
43
weeks |
|
|
|
|
|
|
|
|
shifts |
|
committed |
still
|
Institution |
Authors |
% |
owed |
rounded |
as
of 6/20* |
owed |
Annecy |
6 |
7.8 |
3.35 |
3 |
3 |
0 |
UBC |
4 |
5.2 |
2.23 |
2 |
3 |
0 |
Budker |
4 |
5.2 |
2.23 |
2 |
3 |
0 |
San
Diego |
4 |
5.2 |
2.23 |
2 |
2 |
0 |
Santa
Cruz |
4 |
5.2 |
2.23 |
2 |
0 |
2 |
CSU |
1 |
1.3 |
0.56 |
1 |
0 |
1 |
Colorado |
4 |
5.2 |
2.23 |
2 |
4 |
0 |
Padova |
9 |
11.7 |
5.03 |
5 |
2 |
3 |
Rome |
6 |
7.8 |
3.35 |
3 |
1 |
2 |
Maryland |
4 |
5.2 |
2.23 |
2 |
2 |
0 |
MIT |
3 |
3.9 |
1.68 |
2 |
1 |
1 |
McGill |
3 |
3.9 |
1.68 |
2 |
2 |
0 |
Montreal |
3 |
3.9 |
1.68 |
2 |
2 |
0 |
Princeton |
8 |
10.4 |
4.47 |
4 |
2 |
2 |
SLAC |
11 |
14.3 |
6.14 |
6 |
3 |
3 |
Victoria |
3 |
3.9 |
1.68 |
2 |
1 |
1 |
|
|
|
|
|
|
|
TOTAL |
77 |
100.0 |
43.00 |
|
|
|
|
|
|
|
|
|
|
* Filled shifts: 1-31, except for 24 |
|
|
|
|
|