The goal of the DCH DAQ working group is to evaluate the need to increase the bandwidth of the present system to accomodate the high luminosities anticipated after the summer 2005 shutdown. If such an upgrade is found to be necessary the group will specify the required modifications including detailed hardware specifications, engineering requirements, software and schedule. A document proposing such an upgrade needs to be completed before Oct 30th 2003.