1 February 1997 REVIEW MATERIALS Required for BABAR Electronics Final Design Reviews The purpose of the Final Design Review is to ensure that the project is ready to enter the fabrication phase. This note lists the materials which are required for Final Design Reviews (FDRs) of BABAR electronics subsystems. List of materials for FDR: -------------------------- Updated materials from PDR: Requirements Document Block Diagrams System Description Interface Specifications Document Grounding and Shielding Plan Deliverables List Cost estimate Production schedule New materials for FDR: Summary of design changes since PDR Detailed schematics of production components Detailed mechanical drawings of production components Reliability analysis of components and of system Results of tests of individual preproduction units Results of system tests of preproduction units Quality Assurance Plan, including Production plans Burn-in plans Acceptance test plan Maintenance plan Cooling and Access Plan Cable specifications (incl. safety ratings) Specification of power supply locations