MARCH LAB Activities


Physicist in charge of LAB activities is designated for each day; Please contact and discuss with this person any proposed work in or around the LAB site


Monday Tuesday Wednesday Thursday Friday Saturday Sunday
2 3 4 5 6 7 8
    DCH arrives at SLAC DCH uncrated; helium flow established Helium flush Tension test performed on 1200 wires  
9 10 11 12 13 14 15
Gas and safety system assembly Gas and safety system assembly Gas and safety system assembly Gas system assembly and review Gas and safety system assembly    
16 17 18 19 20 21 22
Gas and safety system assembly Gas and safety system assembly Gas safety system assembly Gas system assembly and review Safety approval to run LAB gas system; helium:isobutane flush Helium:isobutane flush HV test
23 24 25: Bloom 26: Wilson 27: Wilson 28: Wilson 29: Wilson
Safety trip; helium:isobutane flush Safety trip; helium:isobutane flush Helium:isobutane flush; HV test Start individual wire scan Wire scan continued and Xenon injection; Assemble and test cradle Wire scan started but no activity detected; helium flush Helium flush
30: Bloom 31: Bloom          
Test cradle and modify Retest cradle; extract DCH from mobile frame          