|
| |
Thumbnails
Descriptions
- LAB photo1: Bill Sands on top of blue frame
attaching crane straps (1)
- LAB photo2: Bill Sands on top of blue frame
attaching crane straps (2)
- LAB photo3: Chamber hoisted out of blue
construction frame
- LAB photo4: Lowering chamber into temporary
stands
- LAB photo5: Rear endplate view of chamber
sitting in temporary stands
- LAB photo6: David Warner and Bill Sands
preparing to remove rear spider
- LAB photo7: Bill Sands removing spider mounts
at front endplate
- LAB photo8: Picking chamber out of cantilever
stand
- LAB photo9: Installing test stand into
chamber suspended from crane
- LAB photo10: Inserting test stand square beam
into chamber
- LAB photo11: Restoring chamber on test stand
into LAB tent
- LAB photo12: David Warner installing
electronics arm (1)
- LAB photo13: David Warner installing
electronics arm (2)
- LAB photo14: Test fit of one wedge of FEA
boxes after electronics arm installation
- LAB photo15: Philip finishing sensor cabling
on DCH front end
- LAB photo16: Rear endplate view with covers
open (1)
- LAB photo17: DCH seen from the rear with
covers open
- LAB photo18: Rear endplate view with covers
open (2)
- LAB photo19: Rear endplate view with covers
open (3)
- LAB photo20: Closeup of installed installed
readout electronics with middle FEA box removed (1)
- LAB photo21: Closeup of installed installed
readout electronics with middle FEA box removed (2)
- LAB photo22: Closeup of front end region
with covers removed (1)
- LAB photo23: Closeup of front end region
with covers removed (2)
- LAB photo24: Masahiro Morii installing FEA
box
- LAB photo25: David Coupal installing FEA box
(1)
- LAB photo26: David Coupal installing FEA box
(2)
For comments, questions or changes to this page contact David MacFarlane
|