|
| |

Welcome to the Drift Chamber Project Home Page.
 |
Overall project description, performance goals,
photographs, institutional membership and member links, and minutes
from meetings |
 |
Internal technical notes |
 |
Data taking operations in IR-2, including shift instructions, expert lists and
contacts, data monitoring and analysis information |
 |
Background studies and results |
 |
Activities and planning for DCH test and commissioning work |
 |
Activities and results from Prototype II |
 |
Job Hazard Analysis and Mitigation (JHAM) documents
Gas, HV, LV, and water safety systems and interlocks |
 |
Gas system design, operations and procedures |
 |
Author list, publication procedures, budget, schedule, and review recommendations |
Subsystem Links:
 |
Detailed information and documentation for DCH mechanical work, including drawings,
performance, drift system, structural design, gas system, fixtures, stringing & QC,
and reviews |
 |
Detailed information and documentation for DCH electronics work |
 |
Detailed information and documentation for DCH software work |
 |
Detailed information and documentation for DCH online software development |
 |
Detailed information and documentation on DCH detector controls |
DCH Hypernews Groups:
 |
Forum for discussion of software development and data analysis |
 |
Forum for discussion of operations issues |
For comments, questions, or changes to this page contact Soeren
Prell
|