SLAC PEP-II
BABAR
SLAC<->RAL
Babar logo
HEPIC E,S & H Databases PDG HEP preprints
Organization Detector Computing Physics Documentation
Personnel Glossary Sitemap Search Hypernews
Unwrap page!
Det. Search
Who's who?
Meetings
FAQ
Images
Archive
Systems
Performance
Intern. region
Vertex Tracker
Drift chamber
DIRC
Calorimeter
IFR
LST
Magnet
Electronics
Trigger
Operations
Run Coordination
Contact Experts
Shift Takers Info
Operations Manual
Electronic Logbook
Ops Hypernews
Shift Signup
Check this page for HTML 4.01 Transitional compliance with the
W3C Validator
(More checks...)

BaBar homepage  EMC SOFTWARE+CALIBRATION MEETINGS

The EMC software/calibration meetings take place every WEDNESDAY at 9:30 a.m. PST (5:30 p.m. UK, 6:30 p.m. MEZ) in the Madrone conferennce room (ROB building, upper floor, near the west stairs and doorway). If you wish to be connected by phone call the conference center at +1-510-665-5437, passcode 830955#. 

Speakers are requested to put a copy of their transparencies on this page, as follows.  

1. Prepare a PostScript or pdf file (not powerpoint as many remote participants use linux systems)

2. Copy the file to the directory $BFROOT/www/Detector/Calorimeter/software/calib_mtg with a name which includes the date (preferably in the form ddmmmyy), and the subject or your name/initials or both, with .ps or .pdf at the end. If a link has already been created on this page it will be simplest to use the name given there. 

3 If the link does not already exist, please send a mail to barlow@slac.stanford.edu giving the name of your file, or edit this page yourself.  

January February March April
May June July August
September October November December

Ongoing projects (and links to working web pages) are:
Calibration with pizeros : Joerg Marks preshowering in the DRC : Rolf Dubitzky and Aleksandra Adametz The edge correction :Stefan Schenk Digital Filter Weights: Wahid Bhimji Splitoff quality studies and software : Debbie Bard
Comparisons between Data and Monte Carlo : Katharine Schofield and Tom Latham Non-Radiative Bhabha calibration : Heiko Jasper Source calibration : Johannes Bauer Light Pulser Calibration  : Bernd Lewandowski Electronics Calibration  : Wahid Bhimji
Simulation of the EMC using Geant4 : Roberto Sacco Radiative Bhabha calibration Photon studies: David Hopkins

Key:

OK and complete OK and ongoing under active development No progress (yet/lately) No progress
This is the Hypernews for Emc software/calibration issues

Old link on General Calibration Issues 

Archive: presentations from 99/00 - - - from 2001 - - - from 2002 - - - from 2003 - - - from 2004




19. January 05 :

26. January 05 :

2. February 05 :

9. February 05 : 16. February 05 : 23. February 05 : No meeting (collaboration week)

2. March 05 : No meeting (just had a collaboration week)

9. March 05 :

16. March 05 :
  • Energy Resolution from Bhabha and gamma-gamma events - Chris
30. March 05 : 6. April 05 :
  • Implementing Pizero calibration and the edge correction - Jörg and others
  • EmcIdentify discussion - Rolf and others
13. April 05 :
  • Progress in Implementing Pizero calibration and the edge correction - Jörg and others
  • EmcIdentify discussion - Rolf and others
  • QA and calibration preparations/results at run start - all
  • Contributions to the IEEE meeting (?)
20. April 05 :
  • Progress in Implementing Pizero calibration and the edge correction - Jörg and others
  • The new run - calibration and QA status - all
  • Plans for Elba
  • Update on mu mu gamma - David
27. April 05 : 4. May 05 : 11. May 05 :
  • Discussion of R18 and pizero++ calibration issues - Jörg and others
18. May 05 :
  • Discussion of R18 and pizero++ calibration and edge correction issues - Rolf and others
  • Pizero Resolution - Jörg
01 June 05 : 08 June 05 : 15 June 05 : 22 June 05 : 29 June 05 : 6 July 05 : 20 July 05 : 27 July 05 :
  • Testing pi0 calibration implementation - Rolf
  • QA Problems/Improvements - Chris/Nick
  • Other Software Issues - Rolf
3 August 05 : 10 August 05 : 17 August 05 : 24 August 05 : 31 August 05 : 7 September 05 :
  • Future Plans - All
21 September 05 : 5 October 05 : 12 October 05 :
  • Sigma to Lambda gamma for theta - Chris
  • Status/plan for cluster calibration - Joerg/Rolf
  • Other EMC issues
19 October 05 : 26 October 05 : 2 November 05 :
  • Status/plan for cluster calibration - Joerg/Rolf
  • Bhabha E/p checks/reprocessing QA - Wolfgang/Chris
9 November 05 : 16 November 05 : 30 November 05 : 7 December 05 :
  • Status of cluster calibration - Rolf
  • Testing the cluster calibration - Chris

Jack Ritchie