|
This file is
$BFROOT/www/Detector/Calorimeter/Operations/pages/EmcSafetyGuide.html
Feel free to add/update/remove items on this page.
Safe Procedures
This contains safe procedures for carrying out common tasks described in the Commissioner's guide
| |
Refilling fluorinert in chillers. |
Cautiously move cannister along floor to chiller;
Stand pump next to chiller .
Place pump in tank and cannister.
Slowly pump fluorinert.
Close tank and cannister.
Replace can safely out of the way.
| |
Replacing Low voltage power supplies |
Switch off the offending power supply by pressing the only button on it.
Pull power supply using the handle (make sure the screws at the
top and bottom are unscrewed).
Insert replacement power supply ensuring fingers clear.
Switch on power supply.
Safe Procedures: EMC Electronics
For a guide detailing safe procedures for EMC electronics work see
The EMC Troubleshooting Guide (BaBar Note 553)
Sample JHAM for EMC worker .doc .sxw
Page author: Wahid Bhimji
Last Update: meow meow
Last modified: Oct 17, 2006
|