SLAC PEP-II
BABAR
SLAC<->RAL
Babar logo
HEPIC E,S & H Databases PDG HEP preprints
Organization Detector Computing Physics Documentation
Personnel Glossary Sitemap Search Hypernews
Unwrap page!
Det. Search
Who's who?
Meetings
FAQ
Images
Archive
Systems
Performance
Intern. region
Vertex Tracker
Drift chamber
DIRC
Calorimeter
IFR
LST
Magnet
Electronics
Trigger
Operations
Run Coordination
Contact Experts
Shift Takers Info
Operations Manual
Electronic Logbook
Ops Hypernews
Shift Signup
Check this page for HTML 4.01 Transitional compliance with the
W3C Validator
(More checks...)

Agenda for the March 26 Background Remediation

It is a very short meeting this time (30') annd STARTING AT 8 30 AM because

a) the background commissioning needs more time for a detailed discussion

of the various analyses

b) I have some family obligations

 

1/ Summary of the discussions held in the Tech Board concerning

the organization for the coming run (Tom Mattison/GW)

 

2/ Brief update (<5' each) of the EPICS readiness status

for the detectors that could not talk last time. I STRONGLY encourage the speakers

to post their material on the Web in advance. (I also remind to those

that have shown stuff last week to send me the electronic references)

DCH A. Roodman

DRC B. Wilson

IFR H. Band

TRG/ONL G. Dubois-Felsmann

EMC A. McKemey

 

Cheers

Guy

PS OI have updated the minutes from last meeting with the references

I have received since and the (quite positive) answers I received to

action items inquiries. Check on the BR web page or on

/BFROOT/www/Detector/Backgrounds/mar19min.htm