SLAC PEP-II
BABAR
SLAC<->RAL
Babar logo
HEPIC E,S & H Databases PDG HEP preprints
Organization Detector Computing Physics Documentation
Personnel Glossary Sitemap Search Hypernews
Unwrap page!
Det. Search
Who's who?
Meetings
FAQ
Images
Archive
Systems
Performance
Intern. region
Vertex Tracker
Drift chamber
DIRC
Calorimeter
IFR
LST
Magnet
Electronics
Trigger
Operations
Run Coordination
Contact Experts
Shift Takers Info
Operations Manual
Electronic Logbook
Ops Hypernews
Shift Signup
Check this page for HTML 4.01 Transitional compliance with the
W3C Validator
(More checks...)

Minutes of Tuesday January 19 Background Remediation Steering Committee

Present: P. Burchat, G. Dubois-Felsmann, T. Geld, I. Karyotakis, W. Kozanecki, GW

The only point discussed was the preparation of the BR workshop Executive Summary and the recommendation to BABAR and PEP-II concerning a possible extension of the PEP-II February run. Compared to the original draft, a whole section concerning radiation exposure of switched_off BABAR elements during the scrubbing and the normal 1999 run was added.

Minor modification were made to the list of Action Items and Open issues.

The final document is available here.