SLAC PEP-II
BABAR
SLAC<->RAL
Babar logo
HEPIC E,S & H Databases PDG HEP preprints
Organization Detector Computing Physics Documentation
Personnel Glossary Sitemap Search Hypernews
Unwrap page!
Det. Search
Who's who?
Meetings
FAQ
Images
Archive
Systems
Performance
Intern. region
Vertex Tracker
Drift chamber
DIRC
Calorimeter
IFR
LST
Magnet
Electronics
Trigger
Operations
Run Coordination
Contact Experts
Shift Takers Info
Operations Manual
Electronic Logbook
Ops Hypernews
Shift Signup
Check this page for HTML 4.01 Transitional compliance with the
W3C Validator
(More checks...)
  • SVT
    • Assess radiation resistance bias ON and OFF
    • Injection Interlock
    • FEE register checks
  • DCH
    • Input to protection system
    • Injection interlock
    • Current draw for the first layer
    • Add lead to the backward plug for extra shielding
    • Try to improve feature extraction limit of 200 hits at 2 kHz
  • DIRC
    • Provide fast signal to improve beam protection system
  • EMC
    • Input to protection system
    • Investigate feature extraction limit (10% occupancy at 2 kHz)
  • IFR
    • Separate HV from outer layers increase current draw limits
    • Add shielding on all gaps
    • Integrate into injectable flags
  • TRG
    • prepare for tight L1 and L3
    • Study time jitter
  • ONL
    • DAQ :Evaluate event size and throughput limits
    • Slow control : Provide EPICS tools
    • Monitor dead time
  • OFF
    • Produce PRV0 background frames
    • Assess tolerable background level
    • prepare selection filter to cope with CPU limitations
  • Management
    • define goals, priorities, strategies, policies and adequate forums
  • BR group
    • prepare BABAR-PEP-II liaison team
    • prepare software week 26-30 April
    • prepare analysis and monitoring tools: Radiation damage for luminosity running, tuning, injection, machine developments