SLAC PEP-II
BABAR
SLAC<->RAL
Babar logo
HEPIC E,S & H Databases PDG HEP preprints
Organization Detector Computing Physics Documentation
Personnel Glossary Sitemap Search Hypernews
Unwrap page!
Det. Search
Who's who?
Meetings
FAQ
Images
Archive
Systems
Performance
Intern. region
Vertex Tracker
Drift chamber
DIRC
Calorimeter
IFR
LST
Magnet
Electronics
Trigger
Operations
Run Coordination
Contact Experts
Shift Takers Info
Operations Manual
Electronic Logbook
Ops Hypernews
Shift Signup
Check this page for HTML 4.01 Transitional compliance with the
W3C Validator
(More checks...)

The  next MDI meeting will be held on

Friday,  9 April 2004 from 8:30 to 10:00 (PST) in  Pom/Flora (building 280 room 112)  

The call-in number is 1-510-665-5437, pass code 4055


            Agenda

(1) BaBar-wide background report ( S. Foulkes, 10')

(2) Background simulations

         (a)  Magnetic transport in G4 IR model (G.Bower, 10')

         (b)  Status report on radiative-Bhabha backgrounds (P. Roudeau; see also M. Sullivan)

         (c)  Overall status (Witold)

(3) Belle-BaBar templates

         (a)  DCH

         (b)  SVT

(4) Background analysis

         (a)  IR vacuum problems: end of (this) saga ((G. Wormser)

(5) A.O.B.