Time: Wednesday, September 23, 1998, 08:30 am - 12:00 non PDT (at the latest)
Location: SLAC Group C conference room
The purpose of this review is to cover where
- Development of the Framework-based simulation, including
- random number management
- Generators
- Fast simulation in Bogus and downstream modules
- Full simulation in Bogus
- Current simulation status and plans, including
- MDCII production status and plans for future MDC
- QA tools development
- bbsim simulation developments, including beam-line upgrades
- detector response
- Eventual MiniMC and hybrid simulation requirements ( html)
The review will be accessible by phone, CUSeeMe, Web and Fax. The Group C fax number is (650) 926-2657.
The phone dial-in number is (973) 321-2000, passcode 17403. Ask for the SLAC conference moderated by Bill Lockman.
Cu-SeeMe connection is available via cuseeme.slac.stanford.edu reflector at IP Address 134.79.232.11, with Conference ID 1.
Agenda
- Overview ( html, ps) -- 15 min - Bill Lockman
- Geant4 schedule and Bogus Overview ( html, PS) -- 10 min -
Gabriele Cosmo
- Materials: MatEnv - status ( html, PS) -- 5 min -
Gabriele Cosmo
- Subsystem developments in Bogus fast and full simulation (90 min)
- Generators and random number management -- 15 min - Anders Ryd/Abi Soffer
- Current simulation (65 min)
- MDC-II status (html) -- 10 min - Adil Hasan
- QA tools development -- 10 min - Mehdi Benkebil/David Aston
- Monte Carlo truth issues (html) -- 10 min - Pierre Alexander Fischer
- PEP beam line update -- 10 min - Terry Geld
- Dch in bbsim -- 10 min - Ernesto Lamanna
- Dch digitization status (html) -- 10 min - Sumit Sen
- Svt digitization update (ps) -- 5 min - Fabrizio Bianchi
Bill Lockman |