SLAC PEP-II
BABAR
SLAC<->RAL
Babar logo
HEPIC E,S & H Databases PDG HEP preprints
Organization Detector Computing Physics Documentation
Personnel Glossary Sitemap Search Hypernews
Unwrap page!
Simulation Home
Sim Codes
Event Generators
Bogus/BgsApp
SimApp
Bear
Moose
Fast Simulation
Geant4 Home
Subsystems
PEP
SVT
DCH
DRC
EMC
IFR
Mixing/Trigger
Backgrounds
Mixing
Trigger Simulation
MC Truth/QA
MC Truth
Micro/Mini
QA Histograms
Sim Error Reports
REMEDY
MC Production
Production Home
Test Production
Tools
Database
CERNLIB
CLHEP
Event display
RandControl
Scripts
Check this page for HTML 4.01 Transitional compliance with the
W3C Validator
(More checks...)
BaBar   Computing BaBar Simulation Home
02/23/98 Internal Simulation Review
  Draft version V00-02-00 Maintained by WL

Time: Monday, February 23, 1998, 08:30am - 11:30am PST (at the latest)

Location: SLAC Group C conference room

The purpose of this review is to cover

  • Generators, Geant and detector response simulation readiness for MDCII
  • Simulation development, where we are currently, where were are going and how we get there, including tasks, manpower and schedule.
Guidelines to sim mdcii readiness are found here.

The review will be accessible by phone, CUSeeMe, Web and Fax. The Group C fax number is (650) 926-2657.

The phone dial-in number is (973) 633-8200. Ask for the SLAC conference moderated by Bill Lockman.

Cu-SeeMe connection is available via cuseeme.slac.stanford.edu reflector at IP Address 134.79.232.11, with Conference ID 1.


Agenda

  • Overview -- 15 min - Bill Lockman - ( ps).
    • MDCII preparation
    • Evolution of simulation design to end of 1998
    • Sim schedule

  • Generators -- 20 min - Anders Ryd/Peter Kim
  • Bogus and GEANT4 -- 20 min - Gabriele Cosmo / Andrei Salnikov
    • G4 release coordination, schedule and manpower ( html and ps) (Gabriele)
    • Current Bogus design and scenarios ( html and ps) (Gabriele)
    • Doing Framework and Bogus together ( html and ps) (Andrei)

  • bbsim and XxxSim package, summary of package improvements since last review and readiness for MDCII -- 70 min
    • L1/Fct - Fred Kral ( html). Updated digi page.
    • PEP - Bill Lockman - IR status ( ps) or ( html)
    • SVT - Bill Lockman - DMGeant ( ps), Fabrizio Bianchi - SvtSim ( ps)
    • DRC - Brian Meadows - (ps) / David Aston / Gautier
    • EMC - Helmut Marsiske -- ( html).
    • IFR - Riccardo deSangro / Luca Lista -- ( html)
    • DCH - Ernesto Lamanna - DCH (MDCII) ( html)/ Sumit Sen (html)
  • bbsim infrastructure modifications and QA for MDCII -- 10 min - Peter Kim (html).
  • bfield status for MDCII -- <10 min - Art Snyder.
  • Hit and digi persistency status -- 10 min - Akbar Mokhtarani (text)
  • Bogus subsystem development progress reports -- 50 min
    • SVT:
      • Willy Langeveld -- standalone tracker ( html).
      • Bill Lockman -- manpower and schedule ( ps)
    • DCH - Ernesto Lamanna -- DCH simulation in Bogus ( html)
    • DRC - Fast Drc Model for Bogus ( ps) or ( html) -- Brian Meadows
    • EMC - John Allison
    • IFR - Riccardo de Sangro -- ( html)

    - Bill Lockman