SLAC PEP-II
BABAR
SLAC<->RAL
Babar logo
HEPIC E,S & H Databases PDG HEP preprints
Organization Detector Computing Physics Documentation
Personnel Glossary Sitemap Search Hypernews
Unwrap page!
Simulation Home
Sim Codes
Event Generators
Bogus/BgsApp
SimApp
Bear
Moose
Fast Simulation
Geant4 Home
Subsystems
PEP
SVT
DCH
DRC
EMC
IFR
Mixing/Trigger
Backgrounds
Mixing
Trigger Simulation
MC Truth/QA
MC Truth
Micro/Mini
QA Histograms
Sim Error Reports
REMEDY
MC Production
Production Home
Test Production
Tools
Database
CERNLIB
CLHEP
Event display
RandControl
Scripts
Check this page for HTML 4.01 Transitional compliance with the
W3C Validator
(More checks...)

Production allocations - Sep '96 physics analysis run

See SimProd/defineRuns9609 for details on directives defining the jobs.
------------------------------------------------------------------------------
Status explanations: 
  allocated  allocated to a production site
  done      job completed at production site, tape not necessarily sent
  sent      in the mail
  vault     job done, tape sent to SLAC and in vault, needs migration to silo
  silo      job done, data on SLAC silo tape
  '?'       believed to be in advertised state, but no discussion posting
------------------------------------------------------------------------------

Report updates and inaccuracies to wenaus@llnl.gov, hpark@pizero.colorado.edu

Paul Harrison request, run commencing 9/96 ====================================

continuum qq~->X             50k  30001 - 30025  RAL         silo        1.1.2b
                             12k  30085 - 30092  QMW         done        1.1.2b
                             58k  30130 - 30158  IN2P3       vault       1.1.2b
                            180k  30180 - 30269  IN2P3       done        1.1.2b
                            180k  30330 - 30419  RAL         vault       1.1.2b
                             90k  30480 - 30539  QMW         allocated   1.1.2b

charm cc~->X                 10k  30026 - 30030  RAL         silo        1.1.2b
                             30k  30093 - 30112  QMW         done        1.1.2b
                             40k  30160 - 30179  IN2P3       vault       1.1.2b
                            120k  30270 - 30329  IN2P3       done        1.1.2b
                            120k  30420 - 30479  RAL         vault       1.1.2b
                             60k  30540 - 30579  QMW         allocated   1.1.2b

B0B0~ -> X                   12k  30580 - 30587  QMW         allocated   1.1.2b

B+B- -> X                    12k  30588 - 30595  QMW         allocated   1.1.2b

B0-> pi+ pi-, B0~->X          4k  30041 - 30042  RAL         silo        1.1.2b
B0-> rho+/- pi-/+, B0~->X     4k  30043 - 30044  RAL         silo        1.1.2b
B0-> a1+/- pi-/+, B0~->X      4k  30045 - 30046  RAL         silo        1.1.2b

B0-> J/psi K0L, B0~->X       10k  30047 - 30051  RAL         silo        1.1.2b
B0-> J/psi K0s (charged)     10k  30072 - 30076  QMW         done        1.1.2b
B0-> J/psi K0s (neutral)     12k  30077 - 30084  QMW         done        1.1.2b

B0-> (e,mu,tau) nu X, B0~->X 20k  30052 - 30061  RAL         silo        1.1.2b
B0-> e nu X, B0~->X          12k  30121 - 30128  QMW         done        1.1.2b
B0-> mu nu X, B0~->X         12k  30113 - 30120  QMW         done        1.1.2b

#### Pending

B0-> D+D-, B0~->X            10k                                         1.1.2b
B0-> D*+ D*-, B0~->X         10k                                         1.1.2b

D's are awaiting bug fix
  D*+D*-     10000    D*+- to D0 pi+-   [ D*->X in defined runs 30036-40 ]
  D*+D-      10000    As above

uds continuum, charm, inclusive B0B0~ and B+B-:
1M total ASAP; 4M if possible
  Proportions:
  u,d,s 6                             48
  c     4      or, in percentages     32
  B0B0~ 1.25                          10 lower priority GEN 1 1 
  B+B-  1.25                          10 lower priority