SLAC PEP-II
BABAR
SLAC<->RAL
Babar logo
HEPIC E,S & H Databases PDG HEP preprints
Organization Detector Computing Physics Documentation
Personnel Glossary Sitemap Search Hypernews
Unwrap page!
Simulation Home
Sim Codes
Event Generators
Bogus/BgsApp
SimApp
Bear
Moose
Fast Simulation
Geant4 Home
Subsystems
PEP
SVT
DCH
DRC
EMC
IFR
Mixing/Trigger
Backgrounds
Mixing
Trigger Simulation
MC Truth/QA
MC Truth
Micro/Mini
QA Histograms
Sim Error Reports
REMEDY
MC Production
Production Home
Test Production
Tools
Database
CERNLIB
CLHEP
Event display
RandControl
Scripts
Check this page for HTML 4.01 Transitional compliance with the
W3C Validator
(More checks...)

Review scheduled for Tue Sep 3 (afternoon) and Wed Sep 4 at SLAC

Draft charge for the review

I emphasize, it's a draft.
The BaBar experiment at PEP-II will be a high precision, high statistics
experiment.  Accurate simulation of the experiment has been and will continue
to be vital to its success.  As we move from the design phase
of the experiment into the construction phase, we have the
oppportunity to review in detail the current status and future plans
for the simulation software.

This review should focus on the current status of both the detailed and
the fast detector simulation and the plans for their develpment.
In particular the commitee should consider:

 o Current status and adequacy of the detailed and fast simulations
     of the detector, as the principle tools for evaluating detector and
    physics performance.

o  The status of and plans for the physics event generation and its
   interface to  the detector simulation.

 o Interfacing of simulation work to C++ based reconstruction software
    and real data.

 o Status and plans for the evolution of the simulation software and the move
    towards OO/C++ based simulation tools (GEANT4)

 o The plans for Monte Carlo data production and the ability of the system
    to scale effectively to cope with the foreseen simulation requirements.

o  Are the avilable resources adequate for the tasks.

o  Are available resources within and ouside the collaboration used effectively.

Review preparation

  • First meeting: Fri July 26, 8:30am CA time.
  • Will have a draft agenda for the first meeting
  • Will want to spread around the speaking duties; discuss when draft agenda is in hand
  • need to develop for each subsystem a concise demonstration of the detail and performance level of the simulation; subsystem coordinators please think about this prior to the first meeting. There probably won't be time for individual talks on the subsystem simulations.
Some areas in particular need of attention:
  • pre-review Aslund parametrization updates for the outer detectors EMC: Paul's code in hand, will be put in; DRC: status?; IFR: need a volunteer urgently, as what's in their now isn't defensible. [Geometry generation from dbio/BBSIM will be in]
  • considerations of interfacing simulation and real data
  • timescale for Geant4 essentials, should be clarified in Vancouver
  • scalability of production management, particularly post-production data management given manpower shortage at SLAC
  • estimates of future resource requirements. Need input from simulation consumers as well.
  • anyone wish to add anything?
Anyone want to volunteer for a busy August on a simu review squad putting out fires in simu review preparation?