BaBar reconstruction workshop, Stanford, Nov 14 and 15, 1997
A reconstruction workshop was held on the Stanford campus on November 14 and 15, preceeding the collaboration meeting. The emphasis was on technical discussions of specific problems and the solutions we are evolving, with emphasis on the areas of
calibration and alignment, reconstruction with backgronds present, the eventual migration to event and calibration databases, and the ongoing Mock Data Challenge.
The next workshop in this series will be just before the March 1998 collaboration meeting.
Recent Changes
- 12 Feb, 1998 -- Add pointer to next workshop (Bob)
- 21 Nov, 1997 -- Add pointer to scanned slides (Bob)
- 9 Nov, 1997 -- Agenda update (Bob)
- 31 Oct, 1997 -- More detail (Bob)
- 21 Oct, 1997 -- Created page (Bob)
This meeting was on the Stanford Campus. For more information, look at their information page.
Slides presented at the workshop have been scanned, and are available in this directory.
Friday Nov 14, 1997 - Stanford Campus, Varian Physics Bldg., Rm 208
- 9:00 - 10:45 AM Calibration information
-
- Online calibration support
- What exists, what's coming (Dave Brown)
- Discussion
- 11:00 - 12:30 AM Prompt reconstruction
-
- status of prompt reconstruction, current thinking on:
-
- What constants will we be finding?
- On what timescales?
- (How) Do we feed results back to online?
- How do we run across multiple machines?
- How do we check the results?
- How do we interface to prompt reconstruction?
- 1:30 - 3:00 PM System-specific calibration and aligment
-
- Discussion of system-specific aspects
- Goal: set of issues and items needed by the systems so they can make progress
- 3:30 - 5:00 PM Databases
- David Quarrie will be leading discussions of the conditions and event store databases, installation of Objectivity, migration, etc.
Saturday Nov 15, 1997 Stanford Campus, Varian Physics Bldg., Rm 208
- 9:00 - 10:30 AM Alignment and calibration
- What are our histogramming requirements?
DHP presentation. How can we provide unique histogram ids?
What do we want from MDC2?
What are our specific goals?
- 11:00 - 12:30 AM Reco deliverables for detector commisioning?
- What do we need to have when for use with the detector commissioning, cosmic running, etc?
- 1:30 - 3:00 PM Any Other Business
-
- TBD
Return to BABAR reconstruction software page, BABAR Computing Home Page, or BABAR
Home Page.
Maintained by Bob Jacobsen,
Bob_Jacobsen@lbl.gov 510-486-7355
|