Reconstruction Code Schedule of Events
This page summarizes events of interest to people working on BaBar reconstruction code.
Recent Changes
- 17 Sep, 1998 -- Fixed dates for October collab meeting, workshop (Bob)
- 10 Sep, 1998 -- Fall months added, updated (Bob)
- 17 Apr, 1998 -- Updated release dates (Bob)
- 17 Feb, 1998 -- Updated release dates (Bob)
- 10 Feb, 1998 -- Updated Feb workshop agenda (Bob)
Coming events
- August 25, 1998 P/R/S Forum meeting
- August 31, 1998 No common reco phone meeting
- Cancelled, as this is during the CHEP conference.
- August 31 - Sept 5, 1998 CHEP conference, Chicago
- September 1, 1998 Release deadline
- September 8, 1998 P/R/S Forum meeting
- September 14, 1998 Common Reco phone meeting
-
- Proposal for new organization of ZzzGeom & ZzzEnv packages (D. Brown et al)
- The usual release update, plus a question: Can we figure out how to get a release to "test" every month?
- Organizational changes
- First discussion of the October meeting(s) agendae
- September 15, 1998 Release deadline
- September 22, 1998 P/R/S Forum meeting
- Memory leaks
- September 28, 1998 Common Reco phone meeting
- September 29, 1998 Release deadline
- October 6, 1998 P/R/S Forum meeting
- October 12, 1998 Common Reco phone meeting (Columbus day holiday in US)
- October 13, 1998 Release deadline
- October 20, 1998 P/R/S Forum meeting
- October 14, 1998 Common Reco phone meeting
- October 15, 1998 Release deadline
- October 22, 1998 P/R/S Forum meeting
- October 23-24, 1998 Reco workshop at Stanford
- October 26-29, 1998 Collaboration meeting at SLAC
- October 26, 1998 No common Reco phone meeting due to collab meeting
- October 27, 1998 Release deadline, but phases often vary around collab meeting
- November 3, 1998 P/R/S Forum meeting
- November 9, 1998 Common Reco phone meeting
- November 10, 1998 Release deadline
- November 17, 1998 P/R/S Forum meeting
- November 23, 1998 Common Reco phone meeting
- November 24, 1998 Release deadline
- December 1, 1998 P/R/S Forum meeting
- December 7, 1998 Common Reco phone meeting
- December 8, 1998 Release deadline
- December 15, 1998 P/R/S Forum meeting
The detailed Microsoft project schedule and various forms of Postscript printout are available . Contact Bob if you want even more detail.
Regular meetings
This section lists normal times and expected dates for the ongoing reconstruction meetings. Note that not all meet in any given week. Annoucements are made in the RecoSoft BFMAIL list, and we encourage you to subscribe.
All of these meetings are tentative, and you should consult the announcements to see whether they are taking place in a given week.
- Common Reconstruction Software - Monday 8:30AM California local time, even weeks.
- This is a series of meetings intended for discussion and resolution of questions that cross system boundaries. These include common aspects of the system, release and scheduling questions, etc. Simulation meetings are held in the same timeslot in
alternate weeks. Announcements were issued through the RecoSoft BFMAIL list.
- Physics/Reconstruction/Simulation Forum - Tuesday, 8:30AM California local time, odd weeks.
- Chaired by Maria Grazia Pia, these are intended for discussion and resolution of issues that overlap between physics analysis, reconstruction, and simulation. Purely system-specific questions should be taken to the relevent system meeting series (see
below); physics-specific questions should be taken to the Physics Forum meetings (note similar name) held in the same timeslot in alternate weeks.
- Tracking - Wednesday, 8:30AM California local time, even weeks.
- These are now (spring 1997) occuring biweekly via phone and fax.
Recent meetings in this series have concentrated on the details of design for the common tracking, areas of current implementation, and presentations of future needs in alignment and improved track fitting.
See the tracking summary page for preparatory material and announcements. Minutes are posted to the tracking design discussion group.
- SVT - Thursday, 8:30AM California local time, even weeks.
- DCH - Wednesday, 8:30AM California local time, even weeks.
- EMC - Wednesday, 8:30AM California local time, even weeks.
- DRC - Wednesday, 8:30AM California local time, intermittently.
- IFR - Thursday, 8:30AM California local time, intermittently
- Trigger - Tuesday, ??? California local time, odd weeks.
Events in the recent past
Each of these has a summary page for more information.
Selected items from longer-term schedules
Please note that this is not the official representation of the BaBar schedule.
| Level 3 milestones |
Reconstruction milestones |
Other events |
|
960401 Prototype Reconstruction System Design |
|
|
|
960412 Prototype Event Display Complete |
|
961031 Prototype Object Implementation Complete |
|
|
961031 "User" prototypes for analysis |
|
| 961101 Data Storage Design Review |
|
961101 Review of Data and Database Interfaces |
| 970401 Mock Data Challenge 1 |
|
|
|
|
971031 Database and data storage prototype review |
|
971101 Functionally complete set of reconstruction objects |
|
|
|
971104 Decision on database and data model technology |
|
|
980105 Detector Commisioning Starts |
|
|
980501 Database Deployments |
| 980601 Mock Data Challenge 2 |
|
|
|
981201 Full reconstruction ready for cosmic run |
|
|
|
|
Selected BaBar level 3 milestones
- 961101 Data Storage Design Review
- Conclusion of evaluation studies and review prior to implementation of prototype data storage system.
- 970401 Mock Data Challenge 1
- Demonstrate complete reconstruction chain, produce and process "signal" and "background" events (50K) for mock data analyses. No performance benchmarks, alignment or calibration information.
- 980601 Mock Data Challenge 2
- As for Mock Data Challenge 1, plus 500K events allowing up to 10 complete analyses. Basic resolving of alignment and calibration constants. Reconstruction run on online farm with data to permanent storage. Benchmarking against requirements for 10**8
events.
Reconstruction milestones
- 960401 Prototype Reconstruction System Design
- Data flow diagrams and documentation, specification of required classes/objects and methods/functions required to acheive goals for 11/96 (complete set of dummy objects and user analysis prototypes)
- 961031 Prototype Object Implementation Complete
- Complete set of dummy reconstruction objects filled. Allows subsequent developments to be independent of existance of "earlier" code.
We take this to mean that the complete set of reconstruction objects is being filled somehow, if needed directly from Monte Carlo truth. All the output classes, both the analysis on the back end and those that are used as input internal to the
reconstruction, should exist in a least skeleton form such that development can proceed. Initial implementations of most of the finding and reconstruction algorithms should be usable. Performing alignment and monitoring is not required at this stage, but
it is necessary to have sufficient QA software in place to tell that the code is working.
- 961031 "User" prototypes for analysis
- "user" prototypes for data analysis providing basic access to "tracks and clusters"
- 971101 Functionally complete set of reconstruction objects
- filled by reconstruction software
- 981201 Full reconstruction ready for cosmic run
Other milestones
- 960312 Prototype Event Display Complete
- 961101 Review of Data and Database Interfaces
- Prototype database implementation assumed to begin here
- 971031 Database and data storage prototype review
- 971104 Decision on database and data model technology
- 980501 Database Deployments