BABAR Physics Working Group 12d ``Common Experimental Issues''
Experimental issues common to different measurements of CP violation in neutral B meson decays.
Back to Working Group 12
Contents of this page /BFROOT/old-www/Physics/Workshops/wg12/A> [Contents] [Conveners] [Topics] [Responsibilities]
[References] [Finding References] [Related Web pages] [Contact]
Subgroup convener:
Francois LeDiberder; phone 33.1.44.27.75.39,fax 33.1.44.27.75.39;email, diberder@frcpn11.in2p3.fr.
Assistant convener(s):
J. Frederic Kral, LBL, Phone: 1-510-486-7435, Fax: 1-510-486-5101, Email: JFKral@lbl.gov. Term: Rome workshop 1 through Princeton workshop 2.
Topics
- Algorithms
- Particle identification (lepton, charged hadron, neutral hadron)
- Vertexing
- Kinematic fitting
- Tagging
- Multivariate algorithms
- Event selection cuts (e.g. shape cuts)
- Background contamination
- Detector imperfection and failures
- Analysis at four-vector level
- Angular analysis in vector channels (D*D*, J/psi K*, rho rho, etc.)
- D and D* reconstruction for tagging and angle beta
- Other standard particle reconstruction (J/psi, etc.)
- Statistics
- CP fitting: how to extract CP angles
- Combining the results of several channels for one angle
- Determining initial results with low statistics
- Multi-variate analysis approaches in general
- Setting up limits (Bayesian, Classical, etc.)
- Systematics
- Assembling a list of potentially dominating systematic errors
- Charge asymmetry effects (e.g. pi+ versus pi- detector response)
- Forward-backward asymmetry effects (e.g. B field, detector)
- Tagging systematics
- What aspects of systematics, if any, can we use the Monte Carlo for?
- Running strategy
- Running off the Upsilon(4S)
- Scanning Upsilon(4S)
- Strategy for making unbiased measurements
- Computing requirements from CP physics
- Monte Carlo generators
- Simulation of detector response
- Reconstruction
- Event selection
- Data access
/BFROOT/old-www/Physics/Workshops/wg12/A>
Responsibilities and plan for work
Progress from Orsay to Caltech meeting (see also below)
Progress from Princeton to Orsay meeting (see also Progress from Rome below)
Progress from Rome to Princeton meeting
- Analysis in general - [Towards a Common Analysis Methodology] (Paul Harrison, Jan 2, 1997) [Beta Tutorial] (Charlie Young, February 1997)
- Vertexing - Make tool available and useful - Contact person is John Losecco - Follow-up on error matrix (Sciolla) - Use RecVtx package from Beta; it is based on the Slt package - [Vertexing in Beta] (John Losecco, Dec 2, 1996) - [Vertexing in Beta] (Bob Jacobsen, Dec 16,
1996) [`Vertexing' Neutrals] (John Losecco, Dec 18, 1996) - Vertexing finally works in Beta V00-04-05 [Announcement of vertexing fix] (Bob Jacobsen, Mar 2, 1997) - [Prelease of using
TRACKERR errors] (Gabriella Sciolla, Mar 4, 1997)
- Kinematic fitting - Contact person is John Losecco - Group 12 investigation on kinematic constraints (Dubois-Felsmann) - Use squaw package that is released
- Event shape cuts - coding event shape variable calculations in Beta (Sebong Chun)
- Tagging - Use Cornelius package - Coordinated by Sophie Versille - Interface to Beta due March 1997 (A. Boucham)
- Particle ID - (need contact person) - People with Beta PID experience: Gloria Vuagnin, Peter Elmer
- Experiment wide work
- Leptons
- e: tracking, dE/dx, EMC - QMW and other groups in UK
- mu: tracking, IFR, (dE/dx, EMC) - IFR group
- Charged hadrons
- pi, K, p: tracking, dE/dx, DIRC, combining - PID group, contact: Maurice Benayoun
- Neutral hadrons
- K0S: tracking, vertexing, (dE/dx, DRC)
- K0L, n: IFR - IFR group
- Informal status in Beta (Mar 5, 1997)
- Uniform Interface: class design exists in newest Beta release
- DIRC: Aslund (OK), Reco (almost)
- dE/dx: Aslund (OK), Reco (no)
- IFR-muon: Aslund (almost), Reco (end March 1997)
- EMC: Aslund (??), Reco (May 1997)
- Group 12 work: Investigate what is in Beta - Anne-Marie Lutz
- CP Fitting - Provide new tool - Francois LeDiberder, Art Snyder, Gloria Vuagnin - [CP fitting plans] (LeDiberder, Dec 18, 1996) - [CP fitting with FBAD] (Walter Toki, Mar 7, 1997)
- Angular analysis of vector-vector CP states - Install into MC, develop analysis techniques - Walter Toki, Gloria Vuagnin
- Systematics - Each analysis to come up with list of sources of error
- MC Generators [Event Generators (hypernews)] - There is an "event generator group" lead by Walter Toki
- Work with other working groups that are updating MC
- Time dependent CP violation
- BEGET improvements (related to angular correlations) - issue being discussed in event generator group (Walter Toki, Anders Ryd and others) - [CP violating decay bug fix in
BEGET] (Toki, Mar 4, 1997)
- Francois LeDiberder and Sophie Versille are working on a B -> rho-pi generator with CP violation effects
- BEGET and ASLUND
- WARNING: don't use ASLUND's generator, use BEGET *always* since it is being maintained and bugs have been fixed.
- How to write decay tables [.newdat how-to] (John LoSecco, Feb 22, 1997)
- Detector Simulation - Assemble single working ASLUND - Orsay group (aslund@lal.in2p3.fr) [ASLUND web page]
- ASLUND detector parameterization - Check and improve what is in ASLUND, or contact appropriate subsystem people
- Data store - interim solution to store ASLUND common block as an ntuple - Mehdi Benkebil [Storing ASLUND ntuples] (Dec 6, 1996) [ASLUND event store] (Dec 10, 1996) [ASLUND ntuple event store with Beta] (Feb 14, 1997) [Use ASLUND > V05-00-25 for read back] (Feb 26, 1997)
- Beta expert help - Bob Jacobsen
- Beta novice help - Some WG12 users of Beta can answer questions - Gregory Dubois-Felsmann, Remi Lafaye, John Walsh, Phil Strother
- Beta user discussion list - Paul Harrison - We have been asked to use the [Analysis Tools] discussion group
- BaBar Notes to be used for written communication
- Mock Data Challenge - Workshop group coordinators will ask for types and numbers of events (MDC1 due before May, 1997)
- Bug reports: use GNATS problem reporting (required) and pertinent hypernews groups (optional) - [GNATS Web interface] [GNATS user manual] - Bug fixes should go into CVS maintained released code
- Meetings - Group 12 met at SLAC on February 21, 1997
- Workshop at Princeton - Joint Group 12 meeting on March 18, 1997 [PRINCETON JOINT 12a+12b MEETING AGENDA] [Kral: Tools talk] [Kral: Tools scorecard slide] [All plenary talk slides]
/BFROOT/old-www/Physics/Workshops/wg12/wg12d/97/A>
References for Wg 12d
/BFROOT/old-www/Physics/Workshops/wg12/wg12d/changing/A>
Finding references
/BFROOT/old-www/Physics/Workshops/wg12/wg12d/96/A>
Related web pages and other help
/BFROOT/old-www/Physics/Workshops/wg12/wg12d/96/A>
A Beginner's Guide to HTML